| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.46 | Average TEU per month: 1.05 |
| Active Months: 5 | Average TEU per Shipment: 2.10 |
| Shipment Frequency Std. Dev.: 0.66 |
| Company Name | Shipments |
|---|---|
| TITAN TRUCK & TRAILER PARTS LTD | 7 shipments |
| TITAN TRUCK&TRAILER PARTS LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 391740 Plastics; tube, pipe and hose fittings (e.g. joints, elbows, flanges) | 7 shipments |
| 391740.0 Tubes, pipes and hoses and fittings thereof (for example, joints, elbows, flanges), of plastics | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-21 | CGLSCNG25071050 | TITAN TRUCK & TRAILER PARTS LTD | 27776.0 kg | 391740.0 | LINED BRAKE SHOE BRAKE HARDWARE KIT CARRIER UPDATED THE PORT TEMPORARILY |
| 2025-08-09 | MLILMNB25071130 | TITAN TRUCK & TRAILER PARTS LTD | 26880.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT |
| 2025-07-27 | CGLSCNG25060196 | TITAN TRUCK & TRAILER PARTS LTD | 35019.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT LINED BRAKE SHOE BRAKE HARDWARE KIT |
| 2025-07-06 | CGLSCNG25060080 | TITAN TRUCK & TRAILER PARTS LTD | 26040.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT |
| 2025-06-06 | CGLSCNG25050144 | TITAN TRUCK & TRAILER PARTS LTD | 27618.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT |
| 2025-04-13 | CGLSCNG25030498 | TITAN TRUCK & TRAILER PARTS LTD | 18000.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT |
| 2024-09-10 | GLVVGL2408047721 | TITAN TRUCK&TRAILER PARTS LTD | 17900.0 kg | 391740 | BRAKE HARDWARE KIT LINED BRAKE SHOE |
| 2024-06-04 | CGLSCNG24050960 | TITAN TRUCK & TRAILER PARTS LTD | 26652.0 kg | 391740 | LINED BRAKE SHOE BRAKE HARDWARE KIT |