| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.27 | Average TEU per month: 0.75 |
| Active Months: 3 | Average TEU per Shipment: 2.25 |
| Shipment Frequency Std. Dev.: 0.59 |
| Company Name | Shipments |
|---|---|
| ALGORITHM CONSTRUCTII S3 SRL | 2 shipments |
| RIVER BEACH CORP | 2 shipments |
| ALGORITHM CONSTRUCTII | 1 shipments |
| MIDAS IMPORTACAO E EXPORTACAO LTDA | 1 shipments |
| PARQUE ACUATICO CARNEIROS SPE LTDA | 1 shipments |
| HS Code | Shipments |
|---|---|
| 290243 Cyclic hydrocarbons; p-xylene | 4 shipments |
| 730890 Iron or steel; structures and parts thereof, n.e.c. in heading 7308 | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-04-10 | HLCUME3PC73831AA | ALGORITHM CONSTRUCTII S3 SRL | 4030.0 kg | 730890 | WATERSLIDE HS CODE 73089099 159 PIECES FOR CONSTRUCTION HS CODE 95082999 33 PARTS FOR WATERSLIDE |
| 2024-12-29 | CMDUMXO0730065 | ALGORITHM CONSTRUCTII S3 SRL | 21460.0 kg | 290243 | PIEZAS PARA TOBOGAN ACUATICO FREIGHT PREPAID PARTES PARA TOBOGAN ACUATICO |
| 2024-11-30 | CMDUMXO0725071 | ALGORITHM CONSTRUCTII | 21400.0 kg | 290243 | FREIGHT PREPAID PARTES PARA TOBOGAN ACUATICO PARTES PARA TOBOGAN ACUATICO ENTREGA SIN ORIGINALES (EXPRESS) |
| 2024-11-20 | CMDUMXO0723712 | RIVER BEACH CORP | 6540.0 kg | 290243 | FREIGHT PREPAID PARTES PARA TOBOGAN ENTREGA SIN ORIGINALES (EXPRESS) |
| 2024-07-24 | CMDUMXO0707039 | RIVER BEACH CORP | 6157.0 kg | 290243 | FREIGHT PREPAID PARTES PARA TOBOGAN ACUATICO |
| 2022-06-27 | DSVFMTY0041858 | MIDAS IMPORTACAO E EXPORTACAO LTDA | 3340.0 kg | . . | |
| 2022-06-07 | DSVFMTY0041564 | PARQUE ACUATICO CARNEIROS SPE LTDA | 9920.0 kg | . . |