| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 1.54 |
| Active Months: 1 | Average TEU per Shipment: 18.50 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| CENTRAL GENERADORA ELECTRICA | 5 shipments |
| DEFENSE MARITIME SOLUTIONS INC | 2 shipments |
| WARTSILA NORTH AMERICA INC | 2 shipments |
| W RTSIL NORTH AMERICA | 1 shipments |
| WARTSILA NORTH AMERICA | 1 shipments |
| WARTSILA POWER PROJECT MEXICO S A | 1 shipments |
| HS Code | Shipments |
|---|---|
| 760200 Aluminium; waste and scrap | 2 shipments |
| 842330 Weighing machines; constant weight scales and scales for discharging a predetermined weight of material into a bag or container, including hopper scales | 2 shipments |
| 848390 Transmission components; toothed wheels, chain sprockets and other transmission elements presented separately; parts | 2 shipments |
| 293399 Heterocyclic compounds; n.e.c. in headings no. 2933 | 1 shipments |
| 551342 Woven fabrics of synthetic staple fibres, containing less than 85% by weight of such fibres, mixed mainly or solely with cotton, of a weight not exceeding 170g/m2 | 1 shipments |
| 841989 Machinery, plant and laboratory equipment; for treating materials by change of temperature, other than for making hot drinks or cooking or heating food | 1 shipments |
| 842139 Machinery; for filtering or purifying gases, other than intake air filters for internal combustion engines | 1 shipments |
| 850200 Electric generating sets and rotary converters | 1 shipments |
| 902290 Apparatus based on use of x-rays and similar; parts and accessories (x-ray generators, tubes, high tension generators, control panels and desks, screens, examination or treatment tables, chairs and like | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-01-19 | HCLES00901629 | WARTSILA NORTH AMERICA INC | 110279.0 kg | 842139 | PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT FOR THE PROJECT OF 5 X WRTSIL 20V34DF ENGINES, GENERATORS AND EQUIPMENT FOR THE XCEL ENERGY WHEATON REPOWERING PRO JECT, USA1 SET COMPACT GAS RAMP, LUBE OIL TRANSFER PUMP STATIONARY, LFO FEEDER1 SET SCR CATALYST SPARE KITFREIGHT PREPAIDSHIPPED ON BOA RD GERDA ON 21.10.2024 FROM RAUMA |
| 2024-09-05 | HCLES00864539 | WARTSILA NORTH AMERICA INC | 114713.0 kg | 841989 | PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT POWER PLANT EQUIPMENT AND ACCESSORI PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT PARTIAL SHIPMENT OF:SUPPLY AND DELIVERY OF POWER PLANT EQUIPMENT |
| 2024-08-27 | CMDUHSK0212205 | WARTSILA NORTH AMERICA | 20261.0 kg | 293399 | POWER UPDGRADE PHASE 4- 14 S/21105 WESTERN102 MW UPGRADE 2ND NOTIFY:UTC OVERSEAS INC 2 NORTHPOINT DRIVE, SUITE 200 HOUSTON, USA FREIGHT PREPAID SHIPPERS OWNED CONTAINER |
| 2024-07-25 | ACDFEO2420100 | W RTSIL NORTH AMERICA | 73100.0 kg | 902290 | PARTIAL DELIVERY OF: PARTIAL DELIVERY OF: PARTIAL DELIVERY OF: PARTIAL DELIVERY OF: |
| 2023-02-20 | HLCURTM230129154 | DEFENSE MARITIME SOLUTIONS INC | 6638.0 kg | 848390 | GEARBOX PARTS HS CODE 8483905090 |
| 2023-02-15 | HLCURTM230127075 | DEFENSE MARITIME SOLUTIONS INC | 9233.0 kg | 848390 | GEARBOX PARTS HS CODE 8483905090 |
| 2022-10-15 | ACDFEO2220167 | WARTSILA POWER PROJECT MEXICO S A | 15941.0 kg | 850200 | GRUPO ELECTR GENO CON MOTOR DE EMBOLO (PIST N) DE ENCENDIDO POR COMPRESI N ( MOTOR SEMI DIESEL), CON CAPACIDAD NOMINAL DE GENERACI N SUPERIOR A 2000KVA DESENSAMBLADO CON SUS SCR SYSTEM H.S CODE.8502 . . . GRUPO ELECTR GENO CON MOTOR DE EMBOLO (PIST N) DE ENCENDIDO POR COMPRESI N ( MOTOR SEMI DIESEL), CON CAPACIDAD NOMINAL DE GENERACI N SUPERIOR A 2000KVA DESENSAMBLADO CON SUS SCR SYSTEM H.S CODE.8502 . . . |
| 2022-01-23 | CMDUANT1520542 | CENTRAL GENERADORA ELECTRICA | 17850.0 kg | 842330 | ------------ WSCU5554700 DESCRIPTION---------PEMCORP- RADIATOR BUNDLES - MATERIAL SPARES SHIPPERS OWNED CONTAINER CMA CGM HOUSE B/L CROSS REFERENCE WITH MASTERANT1487706 -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4918117 DESCRIPTION---------PEMCORP- RADIATOR BUNDLES - MATERIAL SPARES SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU5549200 DESCRIPTION---------PEMCORP- RADIATOR BUNDLES - MATERIAL SPARES SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID |
| 2022-01-04 | CMDUANT1516717 | CENTRAL GENERADORA ELECTRICA | 35700.0 kg | 760200 | ------------ WSCU4857765 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4146461 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4357799 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU4775219 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU4805057 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER CMA CGM HOUSE B/L CROSS REFERENCE WITH MASTERANT1486317 -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU4761621 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIALS SPARESSHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID |
| 2021-12-04 | CMDUANT1507501 | CENTRAL GENERADORA ELECTRICA | 17850.0 kg | 842330 | ------------ LGEU4223660 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIAL SPARES SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU5265207 DESCRIPTION---------SHIPPERS OWNED CONTAINER CMA CGM HOUSE B/L CROSS REFERENCE WITH MASTERANT1483619 -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4814616 DESCRIPTION---------SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID |
| 2021-11-26 | CMDUANT1487320 | CENTRAL GENERADORA ELECTRICA | 17850.0 kg | 551342 | ------------ LGEU4876794 DESCRIPTION---------HUINALA - RADIATOR BUNDLES - MATERIAL SPARES SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU4792406 DESCRIPTION---------SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4865104 DESCRIPTION---------SHIPPERS OWNED CONTAINER CMA CGM HOUSE B/L CROSS REFERENCE WITH MASTERANT1483358/01 -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID |
| 2021-11-13 | CMDUANT1482865 | CENTRAL GENERADORA ELECTRICA | 17850.0 kg | 760200 | ------------ WSCU4659374 DESCRIPTION---------SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ WSCU4864553 DESCRIPTION---------HEAT EXCHANGERS SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID ------------ LGEU4816537 DESCRIPTION---------SHIPPERS OWNED CONTAINER -------------GENERIC DESCRIPTION-------------FREIGHT PREPAID CMA CGM HOUSE B/L CROSS REFERENCE WITH MASTERANT1474182 |