| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| MARK ANTHONY BREWING INC | 1 shipments |
| UNION ENGINEERING NA LLC | 1 shipments |
| UNION ENGINEERING NORTH AMERICA | 1 shipments |
| UNION ENGINEERING NORTH AMERICA UEN | 1 shipments |
| YUENGLING BREWING COMPANY | 1 shipments |
| HS Code | Shipments |
|---|---|
| 380520 Gum, wood or sulphate turpentine, other terpenic oils; crude dipentene; sulphite turpentine, other crude para-cymene; pine oil containing alpha-terpineol as the main constituent | 2 shipments |
| 481200 Paper pulp; filter blocks, slabs and plates of paper pulp | 1 shipments |
| 841940 Distilling or rectifying plant; not used for domestic purposes | 1 shipments |
| 841990 Machinery, plant and laboratory equipment; parts of equipment for treating materials by a process involving a change of temperature | 1 shipments |
| 854311 Electrical machines and apparatus; having individual functions, not specified or included elsewhere in this chapter | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2024-09-19 | ZIMTNGB1223741 | YUENGLING BREWING COMPANY | 1230.0 kg | 481200 | HP CARBON FILTER UNIT |
| 2024-05-13 | CWQGNPT240316071 | 5010.0 kg | DENOX | ||
| 2024-05-04 | UULNNB2403LC1154 | 11212.0 kg | 841990 | PARTS FOR CO2 RECOVERY PLANT TYPE AAT 500 PARTS FOR CO2 RECOVERY PLANT TYPE AAT 500 PARTS FOR CO2 RECOVERY PLANT TYPE AAT 500 | |
| 2023-12-02 | SHPT29684122 | UNION ENGINEERING NORTH AMERICA UEN | 475.0 kg | 380520 | OIL COALESCER |
| 2023-03-02 | SHPT29653266 | UNION ENGINEERING NA LLC | 300.0 kg | 380520 | OIL COALESCER |
| 2022-06-06 | SZUKNYC47980472 | UNION ENGINEERING NORTH AMERICA | 8970.0 kg | 841940 | CO2 PLANT CO2 PLANT |
| 2021-08-23 | ASCHML12SHASAV01 | MARK ANTHONY BREWING INC | 126000.0 kg | 854311 | 3RD PARTIAL DELIVERY OUT OF: PROJECT SUNSHINE CO2 RECOVERY PLANT WITH A CAPACITY OF 5,0 T/HFOR FLAVORED MALT BEVERAGE AND HARD SELTZER PRODUCTION FACILITY LIQUID CO2 STORAGE TANKS FOR THE CO2 RECOVERYFOR THE HARD SELTZER-BEER PRODUCTION |