| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.08 |
| Active Months: 1 | Average TEU per Shipment: 1.00 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| METALECTRIK MANUFACTURING | 2 shipments |
| HS Code | Shipments |
|---|---|
| 847439 Machines; for mixing or kneading mineral substances, excluding concrete mixers and machines for mixing mineral substances with bitumen | 1 shipments |
| 851539 Welding machines and apparatus; for arc (including plasma arc) welding of metals, other than fully or partly automatic, whether or not capable of cutting | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-04-11 | MXRSMXRS2512840 | METALECTRIK MANUFACTURING | 8861.0 kg | 851539 | REPAIR PAD-MOUNTED TRANSFORMER 300KVA REPAIR PAD-MOUNTED TRANSFORMER 750KVA REPAIR DISTRIBUTION TRANSFORMER 2000KVA |
| 2024-01-26 | MXRSMXRS2402302 | METALECTRIK MANUFACTURING | 7529.0 kg | 847439 | THREE-PHASE TRANSFORMER STATION IMMERSED IN MINERAL OIL S/N 980356-A2 |
| CALLE EL ARROYO NO 4 ZONA INDUSTRI BAJOS DE HAINA |
|---|