| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.54 | Average TEU per month: 3.75 |
| Active Months: 5 | Average TEU per Shipment: 6.43 |
| Shipment Frequency Std. Dev.: 0.88 |
| Company Name | Shipments |
|---|---|
| GEBR PFEIFFER INC | 4 shipments |
| OZINGA SLAG LLC | 4 shipments |
| HS Code | Shipments |
|---|---|
| 701720 Glassware; laboratory, hygienic or pharmaceutical, whether or not graduated or calibrated, having a linear co-efficient of expansion not over 5 x 10 (to the minus 6), (or 0.000005)) per Kelvin with a temperature of 0-300 degrees C | 4 shipments |
| 294110 Antibiotics; penicillins and their derivatives with a penicillanic acid structure; salts thereof | 1 shipments |
| 732290 Air heaters and hot air distributors, (not electrically heated), incorporating a motor-driven fan or blower and parts thereof, of iron or steel | 1 shipments |
| 820770 Tools, interchangeable; (for machine or hand tools, whether or not power-operated), for milling | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-04-09 | MIQOHAT000059 | GEBR PFEIFFER INC | 142158.0 kg | TO-EG-8105- HANDRAIL TO-EG-8109- HANDRAIL TO-EG-8106- HANDRAIL TO-EG-8107- HANDRAIL TO-EG-8124- CHECKERED PALTE TO-EG-8090- PLATFORM PART 1-STAIR TO-EG-8118- STEEL STRUCTURE FEEDING BUILDING TO-EG-8120- STEEL STRUCTURE FEEDING BUILDING TO-EG-8 | |
| 2025-03-24 | MIQOHAT000054 | GEBR PFEIFFER INC | 48506.0 kg | 294110 | TO-EG- 8095- STEEL STRUCTURE FEEDING BUILDIN G TO-EG- 8092- STEEL STRUCTURE FEEDING BUILDIN G TO-EG- 8093- STEEL STRUCTURE FEEDING BUILDIN G TO-EG- 8094- STEEL STRUCTURE FEEDING BUILDIN G |
| 2025-02-19 | HCLES06000919363 | GEBR PFEIFFER INC | 21318.0 kg | 701720 | VERTICAL ROLLER MILL MVR 5300 C-6 +(INVOICE #6345) PROJECT: PP220314 OZINGA - INDIANA VERTICAL ROLLER MILL MVR 5300 C-6 +(INVOICE #6345) PROJECT: PP220314 OZINGA - INDIANA |
| 2025-01-18 | HLCUALYOK00876AA | OZINGA SLAG LLC | 28381.0 kg | 701720 | VERTICAL ROLLER MILL MVR 5300 C-6 + (INVOICE 6345) PROJECT PP220314 OZINGA - INDIANA VERTICAL ROLLER MILL MVR 5300 C-6 + (INVOICE 6345) PROJECT PP220314 OZINGA - INDIANA VERTICAL ROLLER MILL MVR 5300 C-6 + (INVOICE 6345) PROJECT PP220314 OZINGA - INDIANA |
| 2025-01-14 | HCLEEIF1124JFK04 | OZINGA SLAG LLC | 26842.0 kg | 701720 | VERTICAL ROLLER MILL MVR 5300 C-6 VERTICAL ROLLER MILL MVR 5300 C-6 VERTICAL ROLLER MILL MVR 5300 C-6 VERTICAL ROLLER MILL MVR 5300 C-6 |
| 2025-01-03 | MIQOHAT000040 | OZINGA SLAG LLC | 20766.0 kg | 732290 | TO-EG-8076- DUCT 03 - PART 5.2 - 49/135 A TO-EG-8080- A56-DU04-A53-BF74-75-CH31-CHUTE 32-CH33 TO-EG-8075 - DUCT 03 - PART 5.1 - 47/134 A TO-EG-8079- A53-CH24-CH26-CH29-A56-DU.PG-A53-BF75-FN74-FN75-A56-PL02-PART 2-DU07 TO-EG-8084- FAN CASING SEG-4 TO-EG-8085- FAN CASING SEG-2 |
| 2024-11-19 | HLCUALYOJ02650AA | OZINGA SLAG LLC | 31176.0 kg | 701720 | VERTICAL ROLLER MILL MVR 5300 C-6 + (INVOICE 6311) PROJECT PP220314 OZINGA - INDIANA VERTICAL ROLLER MILL MVR 5300 C-6 + (INVOICE 6311) PROJECT PP220314 OZINGA - INDIANA |
| 2024-07-25 | MIQOHAT000001 | GEBR PFEIFFER INC | 27986.0 kg | 820770 | DUCT 06-160/87 DUCT 01- PART 1 - 5 / 110 A DUCT 01- PART 2 - 11 / 111 DUCT 06-160/86 DUCT 02 -PART 1 -16/120 A DUCT 02 -PART 2 - 17/121 DUCT 02 -PART 3 - 20/122 |