| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.21 | Average TEU per month: 0.38 |
| Active Months: 3 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.43 |
| Company Name | Shipments |
|---|---|
| WHATHEVER IT TAKES TRANSMISSION PAR | 3 shipments |
| WHATEVER IT TAKES TRANSMISSION PART | 2 shipments |
| HS Code | Shipments |
|---|---|
| 710410 Stones; precious or semi-precious, synthetic or reconstructed, piezo-electric quartz, whether or not worked or graded (but not strung, mounted or set), temporarily strung for transport convenience | 2 shipments |
| 721633.0 Iron or non-alloy steel, angles, shapes and sections | 1 shipments |
| 871494 Cycles; parts thereof, brakes, including coaster braking hubs and hub-brakes, and parts thereof | 1 shipments |
| 871499 Cycles; parts thereof, n.e.c. in item no. 8714.9 | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-09 | CHQFTPEUB5081052 | WHATEVER IT TAKES TRANSMISSION PART | 1996.0 kg | 721633.0 | ROTOR KIT,H.S.CODE: . |
| 2025-07-18 | CHQFTPEUB5061067 | WHATEVER IT TAKES TRANSMISSION PART | 3200.0 kg | 871499 | ROTOR KIT |
| 2025-05-23 | CHQFTPEUB5041058 | WHATHEVER IT TAKES TRANSMISSION PAR | 3805.0 kg | 710410 | RUMP GEAR SET, ROTOR KIT |
| 2024-07-24 | CHQFTPEUB4061051 | WHATHEVER IT TAKES TRANSMISSION PAR | 3456.0 kg | 710410 | DRUM ,PUMP GEAR SET |
| 2024-02-15 | CHQFTPEUB3121027 | WHATHEVER IT TAKES TRANSMISSION PAR | 2160.0 kg | 871494 | DRUM HUB |
| NO 16 LUNYA LN MEIYA VIL SHETOU TOWNSHIP |
|---|