SILVERLINE METAL ENGINEERING PVT LT
SILVERLINE METAL ENGINEERING PVT LT's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.29 Average TEU per month: 0.46
Active Months: 3 Average TEU per Shipment: 1.38
Shipment Frequency Std. Dev.: 0.61
Shipments By Companies
Company Name Shipments
ABANAKI COPORATION 2 shipments
BRENNAN JACOBS INC 2 shipments
Shipments By HS Code
HS Code Shipments
250870 Clays (excluding expanded clays of heading no. 6806); chamotte or dinas earths 2 shipments
821191 Knives; table knives, having fixed cutting blades, serrated or not, excluding knives and blades of heading no. 8208 1 shipments
830250 Hat-racks, hat-pegs, brackets and similar fixtures, of base metal 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2025-06-19 MWQTS34408595 ABANAKI COPORATION 1460.0 kg 821191 DECANTER BODY & SLUDGE BASKET; WIPER BLADE; YOKE; TROUGH; COVER; BRACKET; NITRILE WIPER BLADE; POLYPROPYLENE FLOAT BALLS; PLASTIC BAR; TUBES
2025-04-29 SIFKSMUM137416 BRENNAN JACOBS INC 100.0 kg 250870 EARTH CURRENT COLLECTOR
2025-02-20 MWQTS34408371 ABANAKI COPORATION 2462.0 kg 830250 TROUGH; BASE PLATE; NITRILE WIPER BLADE; YOKE; CAGE; BRACKET; DISC SKIMMER
2025-02-15 SIFKSMUM133822 BRENNAN JACOBS INC 130.0 kg 250870 EARTH CURRENT COLLECTOR
Contact information Request
to request contact information.
Other address
SHOP NO 212 2ND FLOOR ECSTACY JS D ROAD MULUND W