| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| ARCH INNOVATIONS INC | 5 shipments |
| ARCH INNOVATION INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 730630 Iron or non-alloy steel (excluding cast iron); tubes and pipes (not seamless), welded, of circular cross-section, n.e.c. in chapter 73 | 2 shipments |
| 760320 Aluminium; powders of lamellar structure, flakes | 2 shipments |
| 140110 Bamboo used primarily for plaiting | 1 shipments |
| 732113 Stoves, ranges, grates, cookers (those with subsidiary boilers for central heating), barbecues, braziers, gas-rings, plate warmers and similar non-electric domestic appliances and parts, of iron or steel | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2023-11-19 | UULNQD23100120 | ARCH INNOVATIONS INC | 9733.0 kg | 760320 | OTHER PARTS OF STEEL STRUCTURE |
| 2023-08-16 | UULNQD23070053 | ARCH INNOVATIONS INC | 27435.0 kg | 730630 | OTHER PARTS OF STEEL STRUCTURE WELDED TUBE OTHER PARTS OF STEEL STRUCTURE WELDED TUBE |
| 2023-07-30 | UULNQD23070008 | ARCH INNOVATIONS INC | 36423.0 kg | 730630 | OTHER PARTS OF STEEL STRUCTURE WELDED TUBE OTHER PARTS OF STEEL STRUCTURE WELDED TUBE |
| 2023-07-06 | UULNQD23060972 | ARCH INNOVATIONS INC | 29286.0 kg | 760320 | OTHER PARTS OF STEEL STRUCTURE OTHER PARTS OF STEEL STRUCTURE |
| 2023-05-20 | UULNQD23041094 | ARCH INNOVATIONS INC | 35107.0 kg | 140110 | OTHER PARTS OF STEEL STRUCTURE BAMBOO FLOORIN. OTHER PARTS OF STEEL STRUCTURE BAMBOO FLOORIN. |
| 2021-01-27 | DWCHSQINS0007767 | ARCH INNOVATION INC | 17109.0 kg | 732113 | OTHER PARTS OF STEEL STRUCTURE THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS. |