| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.33 | Average TEU per month: 0.42 |
| Active Months: 2 | Average TEU per Shipment: 1.25 |
| Shipment Frequency Std. Dev.: 0.78 |
| Company Name | Shipments |
|---|---|
| GE GAS TURBINES LLC | 7 shipments |
| BBM RAILWAY EQUIPMENT LLC | 3 shipments |
| HS Code | Shipments |
|---|---|
| 730799.0 Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel | 4 shipments |
| 845130 Ironing machines and presses (including fusing presses) | 2 shipments |
| 845710 Machining centres; for working metal | 2 shipments |
| 840690 Turbines; parts of steam and other vapour turbines | 1 shipments |
| 847990 Machines and mechanical appliances; parts, of those having individual functions | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-04-27 | DSVFOTA0115878 | GE GAS TURBINES LLC | 2420.0 kg | 730799.0 | FORGING |
| 2026-04-19 | DSVFOTA0115411 | GE GAS TURBINES LLC | 5650.0 kg | 730799.0 | FORGING |
| 2026-03-31 | DSVFOT90002033 | GE GAS TURBINES LLC | 5160.0 kg | 730799.0 | FORGING |
| 2026-03-13 | DSVFOT90002018 | GE GAS TURBINES LLC | 3080.0 kg | 730799.0 | FORGING |
| 2025-01-21 | DSVFOT90001679 | GE GAS TURBINES LLC | 1410.0 kg | 840690 | CW3 - MACHINING , 7FA.05||AWS FINISHED MACHINED SHAFT |
| 2024-03-20 | SVDLSDB27S044763 | BBM RAILWAY EQUIPMENT LLC | 14660.0 kg | 847990 | INDIVIDUAL FUNCTION MACHINERY |
| 2024-01-03 | DSVFOTA0093660 | GE GAS TURBINES LLC | 7084.0 kg | 845710 | 7FA AWS MACHINING |
| 2023-10-18 | DSVFOT90001303 | GE GAS TURBINES LLC | 1600.0 kg | 845710 | 7FA AWS MACHINING |
| 2021-11-17 | SVDL2703920164 | BBM RAILWAY EQUIPMENT LLC | 11840.0 kg | 845130 | PRESSES |
| 2021-11-17 | SVDL2703920159 | BBM RAILWAY EQUIPMENT LLC | 12840.0 kg | 845130 | PRESSES |
| VIA MOTTINELLO 141 |
|---|