NISA PRE ENGINEERED METAL
NISA PRE ENGINEERED METAL's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.29 Average TEU per month: 0.67
Active Months: 3 Average TEU per Shipment: 2.00
Shipment Frequency Std. Dev.: 0.61
Shipments By Companies
Company Name Shipments
TITAN TOWING AND 2 shipments
THE GF IRREVOCABLE TRUST 1 shipments
TITAN TOWING & 1 shipments
Shipments By HS Code
HS Code Shipments
550992 Yarn; (not sewing thread), of synthetic staple fibres, mixed mainly or solely with cotton, n.e.c. in heading no. 5509, not put up for retail sale 2 shipments
730890 Iron or steel; structures and parts thereof, n.e.c. in heading 7308 1 shipments
730890.0 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2025-10-02 AIRLDEL44512 TITAN TOWING & 23540.0 kg 730890.0 MS FABRICATED STRUCTURES COMPONENTS ARTICLES OF IRON OR STEEL
2025-07-23 UASLOAK25020015 TITAN TOWING AND 21090.0 kg 730890 H S CODE 73089090 9406.90.01 M S FABRICATED STRUCTURE COMPONENTS PREFAB BUILDING
2025-07-19 AIRLDEL44282 TITAN TOWING AND 24020.0 kg 550992 M.S FABRICATED STRUCTURE COMPONENTS M.S WASHERS
2025-06-27 AIRLDEL44223 THE GF IRREVOCABLE TRUST 18800.0 kg 550992 M S FABRIACTED STRUCTURE COMPONENTS
Contact information Request
to request contact information.
Other address
D 21 FIRST EAST OF KAILASH
D 21 FIRST FLOOR EAST OF KAILASH
LTD D21 FIRST FLOOR