| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| ENERGIZA PR | 1 shipments |
| REMATEK ENERGIE INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 741300 Copper; stranded wire, cables, plaited bands and the like, not electrically insulated | 1 shipments |
| 847940 Machines; for making rope or cable | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-11-11 | DFFIU6342185360M | ENERGIZA PR | 548.0 kg | 741300 | INSULATED (INCLUDING ENAMELED OR ANODIZED) WI |
| 2021-05-22 | THGLNBO21050690D | REMATEK ENERGIE INC | 960.0 kg | 847940 | SOLAR CABLE |
| NO 101 SHENGSHAN ROAD SHENGSHAN TOWN CIXI |
|---|