| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.27 | Average TEU per month: 0.62 |
| Active Months: 4 | Average TEU per Shipment: 1.88 |
| Shipment Frequency Std. Dev.: 0.46 |
| Company Name | Shipments |
|---|---|
| PPG TRAFFIC SOLUTIONS | 4 shipments |
| PPG INDUSTRIES INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 262060 Slag, ash and residues; (not from the manufacture of iron or steel), containing arsenic, mercury, thallium or their mixtures, of a kind used for the extraction of arsenic or those metals or for the manufacture of their chemical compounds | 2 shipments |
| 940130 Seats; swivel with variable height adjustment, excluding medical, surgical, dental, veterinary or barber furniture | 2 shipments |
| 292229 Amino-naphthols and other amino-phenols, other than those containing more than one kind of oxygen function, their ethers and esters; salts thereof n.e.c. in item no. 2922.2 | 1 shipments |
| 981800 | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-07-09 | MAEU285731313 | PPG TRAFFIC SOLUTIONS | 2306.1 kg | 262060 | SR60 FRAME ASSEMBLY PARTS ASSEMBLY TEL0086 513 83502911 EMAIL J.JENKINSPPG.COM 2.PSA B DP INTERNATIONAL INC. 206 EDDYSTONE AVE CRU M LYNNE PA 19022 EMAIL PPGIMPORTBDPINT.COM IMPORTSPPG.COM |
| 2025-05-21 | MAEU285729473 | PPG TRAFFIC SOLUTIONS | 2248.95 kg | 262060 | SR-28 PAVERMENT HEARTER FRAME PARTS ASSEMBLY -TEL:0086 5 13 83502911 ---TEL: 336-596- 4763 EMAIL: [email protected] M 2.PSA BDP INTERNATIONAL, I NC. 206 EDDYSTONE AVE CRUM LYNNE, PA 19022 EMAIL: PPGI [email protected] IMPORTS@PPG .COM |
| 2025-04-09 | MAEU285276693 | PPG TRAFFIC SOLUTIONS | 2767.41 kg | 292229 | SR-28 PAVERMENT HEARTER FRAME PARTS ASSEMBLY -TEL:0086 5 13 83502911 ---TEL: 336-596- 4763 EMAIL: [email protected] M 2.PSA BDP INTERNATIONAL , INC. 206 EDDYSTONE AVE C RUM LYNNE, PA 19022 EMAIL: P [email protected] IMPORTS@ PPG.COM |
| 2025-01-17 | MAEU285273343 | PPG TRAFFIC SOLUTIONS | 4127.76 kg | 940130 | SR-28 PAVERMENT HEARTER FRAME SR-60 FRAME ASSEMBLY -TEL: 0086 513 83502911 SR-28 PAVERMENT HEARTER FRAME SR-60 FRAME ASSEMBLY -TEL: 0086 513 83502911 |
| 2024-07-06 | HLCUSHA2405CLHS1 | 2606.0 kg | 981800 | SR-28 PAVEMENT HEATER FRAME& SPARE PARTS S/C S24NEA720 MR CODE PPGIND 20 | |
| 2024-05-16 | HLCUSHA2403BGZP9 | PPG INDUSTRIES INC | 2072.0 kg | 940130 | SR-28 PAVEMENT HEATER FRAME |