| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.17 | Average TEU per month: 0.38 |
| Active Months: 1 | Average TEU per Shipment: 2.25 |
| Shipment Frequency Std. Dev.: 0.58 |
| Company Name | Shipments |
|---|---|
| STRUCTURE SOLUTIONS TCI LTD | 2 shipments |
| HS Code | Shipments |
|---|---|
| 590490.0 Linoleum, whether or not cut to shape; floor coverings consisting of a coating or covering applied on a textile backing, whether or not cut to shape | 1 shipments |
| 950640.0 Gymnastics, athletics, other sports (including table tennis) or outdoor games equipment, n.e.c. in this chapter, swimming pools and paddling pools | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-03-27 | MAEU267486754 | STRUCTURE SOLUTIONS TCI LTD | 22100.3 kg | 590490.0 | POPLAR PLYWOOD WITH PLASTIC COATING |
| 2026-03-09 | TSCW18543230 | STRUCTURE SOLUTIONS TCI LTD | 20362.0 kg | 950640.0 | A LOOSE OR UNPACKED ARTICLE MACHINERY AND PAR A LOOSE OR UNPACKED ARTICLE TOOLS |
| BOULEVARD MIGUEL DE CERVANTES SAAVEDRA 233 PISO 1 |
|---|