| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.18 | Average TEU per month: 0.38 |
| Active Months: 3 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.39 |
| Company Name | Shipments |
|---|---|
| MAERSK PROJECT LOGISTICS | 2 shipments |
| ROXUL USA INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 401019 Rubber; vulcanised, conveyor belts or belting, (reinforced with other than metal only or textile materials only) | 1 shipments |
| 750720.0 Nickel; tubes, pipes and tube or pipe fittings (e.g. couplings, elbows, sleeves) | 1 shipments |
| 940410 Mattress supports | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-02-14 | MAEU265518437 | MAERSK PROJECT LOGISTICS | 9120.08 kg | 750720.0 | PRECAST PIPE COMPONENTS SPLITTER |
| 2025-08-19 | MAEU256648751 | ROXUL USA INC | 2618.18 kg | 401019 | STRIP BELT CONVEYOR |
| 2025-07-26 | MAEU256594969 | MAERSK PROJECT LOGISTICS | 6549.98 kg | 940410 | TRAMCO SUPPORTS AND LOADOUT STRUCTURE MODIFICATIONS |