| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| JR FAST TRADE INC | 3 shipments |
| ADI INTERNATIONAL TRADE COMPANY | 1 shipments |
| PIONEER TRADE INC | 1 shipments |
| YALING TRADE INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 050100 Animal products; hair, human, unworked, whether or not washed or scoured, and waste of human hair | 1 shipments |
| 090412 Spices; pepper (of the genus piper), crushed or ground | 1 shipments |
| 392210 Plastics; baths, shower-baths, sinks and wash-basins | 1 shipments |
| 846620 Parts & accessories suited for use solely/principally with machines of headings 8456-8465; work holders | 1 shipments |
| 850490 Electrical transformers, static converters and inductors; parts thereof | 1 shipments |
| 853669 Electrical apparatus; plugs and sockets, for a voltage not exceeding 1000 volts | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-07-24 | UULNNB2207TR161 | YALING TRADE INC | 12769.0 kg | 050100 | COTTON PRINTED KNITTING FABRIC FLOOR MAT BIRTHAIR WEAVING HUMAN HAIR LACE WIG WIG HUMAN H AIR POLYETHYLENE PLATE FURNITURE PADS |
| 2022-07-12 | UULNNB2206TR817 | JR FAST TRADE INC | 12266.0 kg | 392210 | ACRYLIC BLOCK SHOWER CURTAIN STEAM PRESS ONIOLF BURNER |
| 2022-07-10 | UULNNB2206TR811 | ADI INTERNATIONAL TRADE COMPANY | 12050.0 kg | 850490 | COOLING FAN BODY PILLOW BACKPACK SPEAKER IP CSTAND POWER CONVERTER BIKE SEAT CUSHION SHEL F BRUSH |
| 2022-06-27 | UULNNB2206TR217 | JR FAST TRADE INC | 10616.0 kg | 090412 | BRUSH PEPPER GRINDER LEAF SKIMMER STAIR JIG L. |
| 2021-07-19 | UULNNB2106TR1329 | JR FAST TRADE INC | 14533.0 kg | 853669 | WORK LIGHT TAPESTRY CONNECTOR LUGGAGE STAINLE. |
| 2021-05-25 | UULNNB2104TR1589 | PIONEER TRADE INC | 11788.0 kg | 846620 | RETAIL STORE FIXTURES |
| 106 BUILDING A PHASE I XINGHONGJI LOGISTICS PARK |
|---|