| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.17 | Average TEU per month: 1.50 |
| Active Months: 2 | Average TEU per Shipment: 9.00 |
| Shipment Frequency Std. Dev.: 0.39 |
| Company Name | Shipments |
|---|---|
| GUYANA POWER AND LIGHT INC | 1 shipments |
| KALPATARU PROJECTS INTERNATIONAL LIMITED | 1 shipments |
| N V ENERGIE BEDRIJVEN EBS | 1 shipments |
| N V ENERGIE BEDRIJVEN EBS SURINAME | 1 shipments |
| HS Code | Shipments |
|---|---|
| 320411 Dyes; disperse dyes and preparations based thereon | 1 shipments |
| 730890 Iron or steel; structures and parts thereof, n.e.c. in heading 7308 | 1 shipments |
| 853720 Boards, panels, consoles, desks and other bases; for electric control or the distribution of electricity, (other than switching apparatus of heading no. 8517), for a voltage exceeding 1000 volts | 1 shipments |
| 854460 Insulated electric conductors; for a voltage exceeding 1000 volts | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-03-26 | MAEU249399300 | GUYANA POWER AND LIGHT INC | 79661.23 kg | 730890 | CONSTRUCTION OF 3.9KM OF DOUBL E CIRCUIT 69KV TRANSMISSION L INE TO INTERCONNECT A NEW POWE R SHIP TO THE DEMERARA -BARBI CE INTERCONNECTED SYSTEM (DBIS ) CONTRACT NO : #300/2024/02 B DATED 02ND DEC 2024 STEEL M ONOPOLES CONSTRUCTION OF 3.9KM OF DOUBL |
| 2025-02-15 | MAEU248284868 | N V ENERGIE BEDRIJVEN EBS | 14367.33 kg | 854460 | TOTAL 4 DRUMS OF ELECTRICITY SYSTEM UPGRADE AND EXPANSION PROJECT, CONTRACT CDB-930-012, POWER PROJECT SURINAME-LOT 1 SUB STATIONS IN PARAMARIBO & NICKERIE 110KV CABLE CBL,EL EC,BONDING,95MM2,CU,1C,1.8/3KV ,PVC SB NO: 6864592 DT: 29.12 .2024 HS CODE: 85446090, 8544 4999 TOTAL NT WT: 11814.50 KG S TOTAL GR WT: 14367.50 KGS |
| 2024-05-24 | MAEU238060589 | KALPATARU PROJECTS INTERNATIONAL LIMITED | 19866.32 kg | 320411 | TOTAL 2 PACKAGES 1 CRANE 1 W OODEN BOXES ELECTRICITY SYSTE M UPGRADE AND EXPANSION PROJEC T, CONTRACT CDB - 930 -012, P OWER PROJECT SURINAME - LOT 1 SUB STATIONS IN PARAMARIBO & NICKERIE MOBILE CRANE ACE F- 210 20T N GENERATION MACHINE NO. ACE0F210HP0567300 ENGINE NO. NGHM110428 YEAR OF MANUFA CTURE :2023 GROSS WT : 19866. 00 KGS NET WT : 19863.00 KGS SB : 8455359 DT 19-MAR-24 FREIGHT PREPAID |
| 2024-03-02 | MAEU235046383 | N V ENERGIE BEDRIJVEN EBS SURINAME | 13464.21 kg | 853720 | 1X40 FLT CONTAINER ELECTRICIT Y SYSTEM UPGRADE AND EXPANSION PROJECT,CONTRACT CDB-930-012, POWER PROJECT SURINAME-LOT 1 SUB STATIONS IN PARAMARIBO & NICKERIE CAPACITOR BANK-5 MV AR SURGE ARRESTER 1) TELEPH ONE SYS,YEALINK,SIP-T33G 2) T ELEPHONE SYS,IND SWTCH,YEALINK ,SIP-T33G 3) TELEPHONE SYS,CA T6,YEALINK,SIP-T33G SB NO:6 463541 DATE 02.01.2024 SB NO: 6628152 DATE 09.01.2024 SB NO :6463392 DATE 02.01.2024 HSN CODE:85372000,85176290,8535401 0 NET WEIGHT:10274 KGS NOT IFY :-2 KALPATARU PROJECTS IN TERNATIONAL LIMITED STORES TO EVLUCHTWEG MICHILAAN STRAAT PA RAMARIBO, SURINAME CONTACT PE RSON:- VINAY JAISWAL/ VENUBABU BODALA EMAIL: VINAY.JAISWAL@ KALPATARUPOWER.COM / VENUBABU. [email protected] |