| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| HUBB VENTURES INC | 2 shipments |
| HS Code | Shipments |
|---|---|
| 761090 Aluminium; structures (excluding prefabricated buildings of heading no. 9406) and parts of structures, n.e.c. in heading no. 7610, plates, rods, profiles, tubes and the like | 1 shipments |
| 940690 Buildings; prefabricated, not of wood | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2021-06-30 | HLCUBC1210540483 | HUBB VENTURES INC | 21511.0 kg | 940690 | STRUCTURES 104 PACKAGES 9751 KGS COMPLETE HIDROPONIC GREENHOUSE PARTIAL SHIPMENT OF A COMPLETE HIDROPONIC GREENHOUSE WITH ALL PARTS AND ACCESSORIES FOR ITS WELL RUNNING. 4 PARTIAL SHIPMENT HS CODE 9406.90.00.10 14 PACKAGES 11760 KGS SUBSTRATE HS CODE 5305.00.00 |
| 2021-05-21 | HLCUBC1210407054 | HUBB VENTURES INC | 44079.0 kg | 761090 | STRUCTURES METAL PARTIAL SHIPMENT OF A COMPLETE HYDROPONIC GREENHOUSE WITH ALL PARTS AND ACCESSORIES FOR ITS WELL RUNNING. 2 PARTIAL SHIPMENT STRUCTURES METAL PARTIAL SHIPMENT OF A COMPLETE HYDROPONIC GREENHOUSE WITH ALL PARTS AND ACCESSORIES FOR ITS WELL RUNNING. 1 PARTIAL SHIPMENT |