| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| VISION ENGINEERING INC | 4 shipments |
| HS Code | Shipments |
|---|---|
| 750720 Nickel; tube and pipe fittings | 4 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2021-07-30 | CROINO364847 | VISION ENGINEERING INC | 1623.0 kg | 750720 | LIGHT FITTINGS |
| 2021-07-30 | CROINO364848 | VISION ENGINEERING INC | 907.0 kg | 750720 | LIGHT FITTINGS |
| 2021-07-30 | CROINO364921 | VISION ENGINEERING INC | 1499.0 kg | 750720 | LIGHT FITTINGS |
| 2021-05-18 | CROINO361749 | VISION ENGINEERING INC | 1512.0 kg | 750720 | LIGHT FITTINGS |