| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.58 | Average TEU per month: 0.79 |
| Active Months: 5 | Average TEU per Shipment: 1.36 |
| Shipment Frequency Std. Dev.: 0.79 |
| Company Name | Shipments |
|---|---|
| GENERAL ELECTRIC INTERNATIONAL INC | 11 shipments |
| GE VERNOVA INTERNATIONAL LLC | 2 shipments |
| GE REFURBISHED PARTS WAREHOUSE | 1 shipments |
| HS Code | Shipments |
|---|---|
| 842832 Elevators and conveyors; continuous-action, for goods or materials, bucket type, n.e.c. in item no. 8428.20 or 8428.31 | 5 shipments |
| 200950 Juice; tomato, unfermented, not containing added spirit, whether or not containing added sugar or other sweetening matter | 4 shipments |
| 841370 Pumps; centrifugal, n.e.c. in heading no. 8413, for liquids | 3 shipments |
| 841182 Turbines; gas-turbines (excluding turbo-jets and turbo-propellers), of a power exceeding 5000kW | 2 shipments |
| 841199 Turbines; parts of gas turbines (excluding turbo-jets and turbo-propellers) | 2 shipments |
| 761210 Aluminium; collapsible tubular containers, for any material, (not compressed or liquefied gas), 300l capacity or less, whether or not lined, not fitted with mechanical/thermal equipment | 1 shipments |
| 841182.0 Turbo-jets, turbo-propellers and other gas turbines | 1 shipments |
| 841370.0 Pumps; for liquids, whether or not fitted with measuring device, liquid elevators | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-28 | CHSL526188128BJS | 3240.0 kg | 841370.0 | FA. STAGE NOZZLE | |
| 2025-09-23 | CHSL523149973BJS | 3200.0 kg | 841182.0 | GAS TURBINE PARTS - STAGE NOZZLE | |
| 2025-08-01 | CHSL519686070BJS | 1442.0 kg | 841182 | GAS TURBINE PARTS - TRANSITION PIECE | |
| 2025-07-21 | CHSL516216245BJS | 9102.0 kg | 841370 | GAS TURBINE PARTS - STAGE 3 NOZZLE - STAGE 1 NOZZLE -TRANSITION PIECES GAS TURBINE PARTS - STAGE 3 NOZZLE - STAGE 1 NOZZLE -TRANSITION PIECES | |
| 2025-07-21 | CHSL516081376BJS | 4872.0 kg | 841182 | GAS TURBINE PARTS - STAGE 3 SHROUD | |
| 2025-06-08 | CHSL510136327BJS | GE VERNOVA INTERNATIONAL LLC | 2358.0 kg | 841199 | GAS TURBINE PARTS - STAGE 3 BUCKET HS 841199 |
| 2025-05-03 | CHSL507227197BJS | GE VERNOVA INTERNATIONAL LLC | 6084.0 kg | 841199 | GAS TURBINE PARTS - STAGE 3 SHROUD -NOZZLE KIT HS 841199 |
| 2024-03-18 | CHSL465687337BJS | GE REFURBISHED PARTS WAREHOUSE | 1356.0 kg | 761210 | 9FA.03 CAP |
| 2023-02-25 | CHSL421581687BJS | GENERAL ELECTRIC INTERNATIONAL INC | 930.0 kg | 842832 | 7 EA STG1 BUCKET |
| 2023-02-15 | CHSL421579528BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1020.0 kg | 200950 | 7 FA04 STG1 SHROUD |
| 2022-12-26 | CHSL415820622BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1063.0 kg | 842832 | 7EA 1ST STAGE BUCKET BKT MACH TURB ROT STG 1 |
| 2022-10-22 | CHSL411248553BJS | GENERAL ELECTRIC INTERNATIONAL INC | 958.0 kg | 842832 | 7EA 1ST STAGE BUCKET |
| 2022-10-08 | CHSL409513869BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1216.0 kg | 200950 | 7 FA04 STG1 SHROUD |
| 2022-09-03 | CHSL404109823BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1020.0 kg | 200950 | 7 FA04 STG1 SHROUD |
| 2022-08-22 | CHSL399176463BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1020.0 kg | 841370 | STAGE 1 SHROUD |
| 2022-08-09 | CHSL401942047BJS | GENERAL ELECTRIC INTERNATIONAL INC | 924.0 kg | 842832 | 7 EA STG1 BUCKET |
| 2022-08-02 | CHSL400523605BJS | GENERAL ELECTRIC INTERNATIONAL INC | 1020.0 kg | 841370 | STAGE 1 SHROUD |
| 2022-08-02 | CHSL401091564BJS | GENERAL ELECTRIC INTERNATIONAL INC | 910.0 kg | 842832 | STG1 BUCKET |
| 2022-05-14 | CHSL389888859BJS | GENERAL ELECTRIC INTERNATIONAL INC | 2039.0 kg | 200950 | 7 FA03 STG1 SHROUD |