| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| STAGE 2 CONTRACT ENGINEERING LLC | 11 shipments |
| S2 EQUIPMENT LLC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 160242 Meat preparations; of swine, shoulders and cuts thereof, prepared or preserved (excluding homogenised preparations) | 4 shipments |
| 843910 Machinery; for making pulp of fibrous cellulosic material | 4 shipments |
| 840790 Engines; rotary internal combustion piston engines, for other than aircraft or marine propulsion | 1 shipments |
| 847180 Units of automatic data processing machines; n.e.c. in item no. 8471.50, 8471.60 or 8471.70 | 1 shipments |
| 960321 Brushes; toothbrushes | 1 shipments |
| 960622 Buttons; of base metal, not covered with textile material | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2024-07-06 | FTNVSZS000203059 | STAGE 2 CONTRACT ENGINEERING LLC | 738.0 kg | 843910 | RO PLATENO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENTSHIPPED ON BOARD |
| 2024-05-11 | FTNVSZS000200864 | STAGE 2 CONTRACT ENGINEERING LLC | 139.0 kg | 843910 | BRACKET NO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2024-01-24 | FTNVSZS000197563 | STAGE 2 CONTRACT ENGINEERING LLC | 440.0 kg | 960622 | BASE PAD38CARTONS PACKED ON 1PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2023-11-21 | FTNVSZS000195852 | STAGE 2 CONTRACT ENGINEERING LLC | 488.0 kg | 160242 | RO NOTCHED PLATE POWER SUPPLY BRACKET 27CARTONS PACKED ON 1 PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2023-08-07 | FTNVSZS000193548 | STAGE 2 CONTRACT ENGINEERING LLC | 114.0 kg | 843910 | BRACKET8CARTONS PACKED ON 1PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2023-07-08 | FTNVSZS000192555 | STAGE 2 CONTRACT ENGINEERING LLC | 1337.0 kg | 160242 | RO PLATE LP CLIP 82CARTONS PACKED ON 1 PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2023-02-12 | FTNVSZS000188866 | STAGE 2 CONTRACT ENGINEERING LLC | 778.0 kg | 160242 | LP CLIPBRACKET48CARTONS PACKED ON 1 PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2022-11-06 | FTNVSZS000186070 | STAGE 2 CONTRACT ENGINEERING LLC | 450.0 kg | 843910 | LP CLIPRO NOTCHED PLATE 29CARTONS PACKED ON 1PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2022-10-05 | FTNVSZS000185170 | STAGE 2 CONTRACT ENGINEERING LLC | 682.0 kg | 160242 | RO PLATE BRACKET37CARTONS PACKED ON 1PALLET14CARTONS PACKED ON 1PALLETNO SOLID WOOD PACKING MATERIAL IS USED IN THE SHIPMENT |
| 2022-06-07 | FTNVSZS000180581 | STAGE 2 CONTRACT ENGINEERING LLC | 338.0 kg | 847180 | BASE PAD |
| 2021-10-10 | FTNVSZS000171421 | STAGE 2 CONTRACT ENGINEERING LLC | 1686.0 kg | 960321 | RO PLATE |
| 2021-01-03 | FTNVSZS000158972 | S2 EQUIPMENT LLC | 552.0 kg | 840790 | LP CLIP |