FMC TECHNOLOGIES INDIA PVT
FMC TECHNOLOGIES INDIA PVT's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.23 Average TEU per month: 0.83
Active Months: 2 Average TEU per Shipment: 3.33
Shipment Frequency Std. Dev.: 0.60
Shipments By Companies
Company Name Shipments
FMC TECHNOLOGIES INC 3 shipments
Shipments By HS Code
HS Code Shipments
551342.0 Woven fabrics of synthetic staple fibres, containing less than 85% by weight of such fibres, mixed mainly or solely with cotton, of a weight not exceeding 170g/m2 2 shipments
820740.0 Tools, interchangeable; for hand tools, whether or not power-operated, or for machine tools (pressing, stamping, punching, drilling etc), including dies for drawing or extruding metal, and rock drilling or earth boring tools 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2026-03-11 PGSMNSPMOB015432 FMC TECHNOLOGIES INC 13140.0 kg 551342.0 HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PLATE(S), -ELECTRICAL, K SI, BAR WP, F/ UTH-/, F/ SNEPCO BONGA NORTH PROJECT HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PLATE(S), -ELECTRICAL, K SI, BAR WP, F/ UTH-/, F/ SNEPCO BONGA NORTH PROJECT HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PLATE(S), -ELECTRICAL, K SI, BAR WP, F/ UTH-/, F/ SNEPCO BONGA NORTH PROJECT HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PLATE(S), -ELECTRICAL, K SI, BAR WP, F/ UTH-/, F/ SNEPCO BONGA NORTH PROJECT
2026-01-27 PGSMNSPMOB013058 FMC TECHNOLOGIES INC 7067.0 kg 820740.0 COBRAHEAD,ASSY,MQC- MKIII, -LINES, EC, DE GREE, F/CHA- /CHA- ,F/UMB- B/ C, F/SNEPCO BONGA NORTH PROJECT PART NO P , IT EM NO & HSN CODE COBRAHEAD,ASSY,MQC- MKIII, -LINES, EC, DE GREE, F/CHA- /CHA- ,F/UMB- B/ C, F/SNEPCO BONGA NORTH PROJECT PART NO P ,
2026-01-03 PGSMNSPMOB012492 FMC TECHNOLOGIES INC 9741.0 kg 551342.0 UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PL ATE(S), -ELECTRICAL, KSI, BAR WP F/ U TH- / / / / , F/ SNEPCO BONGA NORTH PROJ ECT HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PL ATE(S), -ELECTRICAL, KSI, BAR WP F/ U TH- / / / / , F/ SNEPCO BONGA NORTH PROJ ECT HSN CODE UMBILICAL TERMINATION ASSY (UTA), W/ -MQC PL ATE(S), -ELECTRICAL, KSI, BAR WP F/ U TH- / / / / , F/ SNEPCO BONGA NORTH PROJ ECT HSN CODE
Contact information Request
to request contact information.
Other address