ELECTROMOTIVE DIESEL LIMITED
ELECTROMOTIVE DIESEL LIMITED's Shipments Over Time
Supply Ratings
| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 5.15 | Average TEU per month: 8.71 |
| Active Months: 13 | Average TEU per Shipment: 1.56 |
| Shipment Frequency Std. Dev.: 2.44 |
Shipments By Companies
| Company Name | Shipments |
|---|---|
| PROGRESS RAIL SERVICES | 157 shipments |
| PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 118 shipments |
| PROGRESS RAIL SERVICES CORP | 17 shipments |
| PROGRESS RAIL PARTS DC | 9 shipments |
Shipments By HS Code
| HS Code | Shipments |
|---|---|
| 761410 Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated), with steel core | 72 shipments |
| 840999 Engines; parts for internal combustion piston engines (excluding spark-ignition) | 68 shipments |
| 843999 Machinery; parts of machinery for making or finishing paper or paperboard | 63 shipments |
| 761410.0 Aluminium; stranded wire, cables, plaited bands and the like, (not electrically insulated) | 27 shipments |
| 843999.0 Machinery; for making pulp of fibrous cellulosic material, or for making or finishing paper or paperboard | 20 shipments |
| 841330 Pumps; fuel, lubricating or cooling medium pumps for internal combustion piston engines | 17 shipments |
| 843069 Machinery; for moving, levelling, scraping, grading, excavating earth minerals or ores; not self propelled n.e.c in 84.30 | 10 shipments |
| 848360 Clutches and shaft couplings (including universal joints) | 6 shipments |
| 843420 Dairy machinery | 3 shipments |
| 847790 Machinery; parts of the machines of heading no. 8477, n.e.c. in item no. 8477.90 | 3 shipments |
| 847960 Machinery and mechanical appliances; evaporative air coolers | 3 shipments |
| 910129 Wrist-watches; (not electrically operated), (not automatic winding), whether or not incorporating a stop-watch facility, case of precious metal or of metal clad with precious metal | 3 shipments |
| 320411 Dyes; disperse dyes and preparations based thereon | 1 shipments |
| 391740 Plastics; tube, pipe and hose fittings (e.g. joints, elbows, flanges) | 1 shipments |
| 730230 Iron or steel, railway or tramway track construction material; switch blades, crossing frogs, point rods and other crossing pieces | 1 shipments |
| 841480 Pumps and compressors; for air, vacuum or gas, n.e.c. in heading no. 8414 | 1 shipments |
| 843149 Machinery; parts of machines handling earth, minerals or ores and n.e.c. in heading no. 8431 | 1 shipments |
| 860719 Railway or tramway locomotives or rolling stock; parts, axles and wheels, and parts thereof | 1 shipments |
Latest Shipments
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-09-29 | IILU160250000 | PROGRESS RAIL SERVICES | 3100.81 kg | 841480 | PARTS FOR MACHINERY TURBO HS CODE 84148 08090 8607919000 |
| 2026-09-29 | IILU160294400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 2390.02 kg | 847790 | CHARGE AIR COOLER LB PARTS FOR MACHINERY |
| 2026-09-07 | IILU159955300 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 574.71 kg | 847960 | CHARGE AIR COOLER LB |
| 2026-08-31 | IILU159606000 | PROGRESS RAIL SERVICES | 1625.7 kg | 843999 | PARTS FOR MACHINERY TURBO |
| 2026-08-31 | IILU159632800 | PROGRESS RAIL SERVICES | 810.58 kg | 843999 | PARTS FOR MACHINERY TURBO |
| 2026-08-17 | IILU159090900 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1153.96 kg | 847960 | CHARGE AIR COOLER LB |
| 2026-08-17 | IILU159136600 | PROGRESS RAIL SERVICES | 5187.82 kg | 843999 | PARTS FOR MACHINERY TURBO |
| 2026-08-10 | IILU158928800 | PROGRESS RAIL SERVICES | 1372.59 kg | 910129 | PARTS FOR MACHINERY TURBO 17.7:1 UTEX ECO |
| 2026-08-03 | IILU158627800 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 429.56 kg | 847960 | CHARGE AIR COOLER LB |
| 2026-08-03 | IILU158641200 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 743.9 kg | 847790 | PARTS FOR MACHINERY CHARGE AIR COOLER-LB |
| 2026-07-27 | IILU158277200 | PROGRESS RAIL SERVICES | 1332.68 kg | 910129 | PARTS FOR MACHINERY TURBO 17.7:1 UTEX ECO |
| 2026-07-20 | IILU158157400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 734.83 kg | 843999 | PARTS FOR MACHINERY |
| 2026-07-20 | IILU158188500 | PROGRESS RAIL SERVICES | 476.73 kg | 843149 | PARTS FOR MACHINERY VALVE BRIDGE ASM-CORE |
| 2026-07-06 | IILU157970000 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 234.96 kg | 843999 | PARTS FOR MACHINERY |
| 2026-06-29 | IILU157631700 | PROGRESS RAIL SERVICES | 1369.87 kg | 843999 | PARTS FOR MACHINERY TURBO 18.3:1-UTEX ECO |
| 2026-06-29 | IILU157648400 | PROGRESS RAIL PARTS DC | 562.92 kg | 391740 | BRAKE CYLINDER 7X8 |
| 2026-06-23 | IILU157520800 | PROGRESS RAIL SERVICES | 888.6 kg | 843999 | PARTS FOR MACHINERY |
| 2026-06-23 | IILU157519900 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1991.76 kg | 843999 | PARTS FOR MACHINERY |
| 2026-06-09 | IILU156811500 | PROGRESS RAIL SERVICES | 13798.97 kg | 843999 | PARTS FOR MACHINERY PARTS FOR MACHINERY |
| 2026-06-09 | IILU156817600 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1266.9 kg | 843999 | PARTS FOR MACHINERY |
| 2026-05-12 | IILU156163400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1839.8 kg | 843999 | PARTS FOR MACHINERY PARTS FOR MACHINERY |
| 2026-05-12 | IILU156162900 | PROGRESS RAIL SERVICES | 3923.64 kg | 843999 | PARTS FOR MACHINERY PARTS FOR MACHINERY |
| 2026-04-07 | IILU155181500 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1358.99 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-04-07 | IILU155142300 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 2075.67 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-04-07 | IILU155141100 | PROGRESS RAIL SERVICES | 3051.82 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-03-31 | IILU154762400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 650.01 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-03-17 | IILU154417200 | PROGRESS RAIL PARTS DC | 1096.8 kg | 761410.0 | TURBO CORE |
| 2026-03-10 | IILU154021800 | PROGRESS RAIL SERVICES | 1131.73 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-03-10 | IILU154023200 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 785.64 kg | 843999.0 | PARTS FOR MACHINERY PARTS FOR MACHINERY |
| 2026-02-25 | IILU153736400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 116.58 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-02-17 | IILU153503400 | PROGRESS RAIL SERVICES | 4545.07 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-02-17 | IILU153513100 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1113.59 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-02-06 | IILU152956900 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 756.6 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-02-06 | IILU152936400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1640.67 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-01-27 | IILU152699100 | PROGRESS RAIL SERVICES | 15176.1 kg | 843999.0 | PARTS FOR MACHINERY PARTS FOR MACHINERY |
| 2026-01-03 | IILU152428800 | PROGRESS RAIL SERVICES | 6901.07 kg | 843999.0 | PARTS FOR MACHINERY |
| 2026-01-03 | IILU152375800 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 528.9 kg | 843999.0 | PARTS FOR MACHINERY |
| 2025-12-09 | IILU151651800 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 570.63 kg | 761410.0 | TURBO CORE |
| 2025-12-09 | IILU151651500 | PROGRESS RAIL SERVICES | 1526.82 kg | 761410.0 | TURBO CORE |
| 2025-12-09 | IILU151651200 | PROGRESS RAIL PARTS DC | 210.92 kg | 761410.0 | TURBO CORE |
| 2025-12-01 | IILU151492100 | PROGRESS RAIL PARTS DC | 3348.93 kg | 761410.0 | TURBO CORE |
| 2025-11-24 | IILU151319700 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 446.8 kg | 761410.0 | TURBO CORE |
| 2025-11-24 | IILU151326300 | PROGRESS RAIL SERVICES | 1581.7 kg | 761410.0 | TURBO CORE TURBO CORE |
| 2025-11-11 | IILU150683000 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 587.87 kg | 761410.0 | TURBO CORE |
| 2025-11-11 | IILU150963600 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1934.6 kg | 761410.0 | TURBO CORE |
| 2025-11-11 | IILU151000200 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1071.86 kg | 761410.0 | TURBO CORE TURBO CORE |
| 2025-11-11 | IILU150995600 | PROGRESS RAIL SERVICES | 2725.68 kg | 761410.0 | TURBO CORE TURBO CORE |
| 2025-11-04 | IILU150613100 | PROGRESS RAIL SERVICES | 3242.79 kg | 761410.0 | TURBO CORE |
| 2025-11-04 | IILU150668400 | PROGRESS RAIL LOCOMOTIVE KC CORE PROCESSING CENTRE DOCKS | 1583.97 kg | 761410.0 | TURBO CORE |
| 2025-10-28 | IILU150446300 | PROGRESS RAIL SERVICES | 1124.93 kg | 761410.0 | TURBO CORE |