| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| JEREH OIL GAS ENGINEERING CORP | 3 shipments |
| NINE TECH CORP | 1 shipments |
| HS Code | Shipments |
|---|---|
| 840790 Engines; rotary internal combustion piston engines, for other than aircraft or marine propulsion | 3 shipments |
| 482030 Paper and paperboard; binders, folders and file covers | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-02-14 | EXDO6100059377 | NINE TECH CORP | 5278.0 kg | 482030 | ENGINATOR AND LOOSE PARTS |
| 2021-06-30 | CMDUNAM4510125 | JEREH OIL GAS ENGINEERING CORP | 69856.0 kg | 840790 | UNITS INNIO WAUKESHA GAS ENGINE SERIAL WAU-1496031 OVERSIZE - HEIGHT: 1.41 MT - LEFT: .01 MT - RIGHT: .01 MT PALLETS OF THE LOOSE PARTS HS CODE : 8407.90.00 PROOF OF REPORT LH225620210527810566 RFI PENDING - CONTAINER MISSING TRK WILL RETURN DAMAGED FF TODAY AND LEON WILBOOKING WAS IONCREASED SO THYE CLOULD GET ANOTT LEON,ONE FF WAS DAMAGED WHEN THYE WENT TO CNTR MISSING ON SI MISSING PACKAGE TYPE MISSING NCB UNITS INNIO WAUKESHA GAS ENGINE SERIAL WAU-1496038 OVERSIZE - HEIGHT: 1.41 MT - LEFT: .01 MT - RIGHT: .01 MT |
| 2021-06-19 | CMDUNAM4519345 | JEREH OIL GAS ENGINEERING CORP | 30136.0 kg | 840790 | RFI CLOSED - NCB MISSING PACKAGES 1 INNIO WAUKESHA GAS ENGINE SERIAL WAU-1496371 1 INNIO WAUKESHA GAS ENGINE SERIAL WAU-1496376 2 PACKAGES OF THE LOOSE PARTS HS CODE : 8407.90.00 PROOF OF REPORT LH225620210609842893 FREIGHT PREPAID OVERSIZE - HEIGHT: .59 MT |
| 2021-04-17 | CMDUNAM4360492 | JEREH OIL GAS ENGINEERING CORP | 23680.0 kg | 840790 | INNIO WAUKESHA GAS ENGINE PACKAGES 1 INNIO WAUKESHA GAS ENGINE SERIAL WAU-1482741 1 WOODEN CRATE OF THE LOOSE PARTS HS CODE : 8407.90.00 OVERSIZE - HEIGHT: 1.08 MT |