| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.26 | Average TEU per month: 0.54 |
| Active Months: 5 | Average TEU per Shipment: 1.30 |
| Shipment Frequency Std. Dev.: 0.45 |
| Company Name | Shipments |
|---|---|
| HABCO MANUFACTURING INC | 3 shipments |
| ENRX EHE | 2 shipments |
| FUTURE FUND INVESTMENTS | 1 shipments |
| HS Code | Shipments |
|---|---|
| 741110 Copper; tubes and pipes, of refined copper | 2 shipments |
| 220210 Waters; including mineral and aerated, containing added sugar or other sweetening matter or flavoured | 1 shipments |
| 741210.0 Copper; tube or pipe fittings (e.g. couplings, elbows, sleeves) | 1 shipments |
| 760719 Aluminium; foil, (not backed), of a thickness not exceeding 0.2mm, not rolled | 1 shipments |
| 853931.0 Lamps; electric filament or discharge lamps, including sealed beam lamp units and ultra-violet or infra-red lamps, arc lamps, light-emitting diode (LED) lamps | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-12-17 | BANQ1070904212 | HABCO MANUFACTURING INC | 638.0 kg | 741210.0 | LWC COPPER TUBE HS: COPPER TUBE HS: |
| 2025-11-20 | CHKMSH25215681 | ENRX EHE | 1132.0 kg | 853931.0 | STRAIGHT TUBE SOFT ROLL |
| 2025-05-02 | BANQ1066225840 | HABCO MANUFACTURING INC | 226.0 kg | 741110 | LWC COPPER TUBE HS CODE:741110 |
| 2025-04-14 | BANQ1065485227 | HABCO MANUFACTURING INC | 385.0 kg | 741110 | COPPER TUBE HS CODE:741110 |
| 2025-01-25 | CHKMSH24237274 | ENRX EHE | 1205.0 kg | 220210 | C1220 SOFT ROLL 8ROLLS=2PALLET |
| 2022-05-28 | AMIGL220138329A | FUTURE FUND INVESTMENTS | 800.0 kg | 760719 | ALUMINUM FOIL FEEDING MACHINE 8443911110 |