| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.25 | Average TEU per month: 0.50 |
| Active Months: 2 | Average TEU per Shipment: 2.00 |
| Shipment Frequency Std. Dev.: 0.62 |
| Company Name | Shipments |
|---|---|
| ORMAT NEVADA INC | 3 shipments |
| HS Code | Shipments |
|---|---|
| 721790.0 Wire of iron or non-alloy steel | 1 shipments |
| 730722.0 Tube or pipe fittings (e.g. couplings, elbows, sleeves), of iron or steel | 1 shipments |
| 842139.0 Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-10-24 | CNRMTSN25090544 | ORMAT NEVADA INC | 25472.0 kg | 730722.0 | FLANGE FORGED FITTING PIPE FITTING PIPE STAINLESS STEEL PIPE FLANGE FORGED FITTING PIPE FITTING PIPE STAINLESS STEEL PIPE |
| 2025-10-08 | SYLCTLITS2509008 | ORMAT NEVADA INC | 8811.0 kg | 842139.0 | EQUIPMENT FOR ORMAT S POWER PLANTS |
| 2025-09-18 | GWLYPUS25093391T | ORMAT NEVADA INC | 1494.0 kg | 721790.0 | CARBON STEEL PIPE FITTING HS CARBO N STEEL TEE HS CARBON STEEL ELBOW HS PARTS FOR PUNA GEOTHERMAL POWER PROJECT |