| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.33 | Average TEU per month: 0.51 |
| Active Months: 1 | Average TEU per Shipment: 1.53 |
| Shipment Frequency Std. Dev.: 1.15 |
| Company Name | Shipments |
|---|---|
| CHINA HARBOUR ENGINEERING CO | 3 shipments |
| CHINA HARBOUR ENGINEERING CO LTD | 1 shipments |
| METRO LINEA 1 S A S | 1 shipments |
| HS Code | Shipments |
|---|---|
| 320416 Dyes; reactive dyes and preparations based thereon | 1 shipments |
| 690390 Refractory ceramic goods; composition of which n.e.c. in heading no. 6903, other than those of siliceous fossil meals or similar earths | 1 shipments |
| 730723 Steel, stainless; tube or pipe fittings, butt welding fittings | 1 shipments |
| 841340 Pumps; concrete pumps | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2024-12-11 | MEDUJG633723 | CHINA HARBOUR ENGINEERING CO | 7820.0 kg | WEIGHBRIDGE - WEIGHBRIDGE | |
| 2024-12-11 | MEDUJG633731 | CHINA HARBOUR ENGINEERING CO | 28008.0 kg | 730723 | SQUARE TUBE - SQUARE STEEL PIPE; COLOR STEEL PLATE; WIREROPE; NAIL |
| 2024-12-11 | MEDUJG667663 | CHINA HARBOUR ENGINEERING CO | 45510.0 kg | 690390 | BRICK MAKING MACHINE8 - BRICK MACHINE; PRESTRESSED ANCHORAGE; AIR SAC; EXPANSION JOINT; PEDESTAL; DRAINAGE PIPE BRICK MAKING MACHINE8 - BRICK MACHINE; PRESTRESSED ANCHORAGE; AIR SAC; EXPANSION JOINT; PEDESTAL; DRAINAGE PIPE |
| 2024-12-03 | CQSQRAC11ZJBUE41 | METRO LINEA 1 S A S | 859040.0 kg | 841340 | CONCRETE SLEEPER |
| 2021-03-23 | SEAU911964339 | CHINA HARBOUR ENGINEERING CO LTD | 68947.2 kg | 320416 | 1 UNIT - EC300DL EXCAVATOR 201 3 VIN # VCEC300DP00270267 1 U NIT - EC380DL EXCAVATOR 2013 V IN # VCEC380DP00270821BREAKING HAMMER 20 13 1 UNIT - EC300DL EXCAVATOR 201 3 VIN # VCEC300DP00270267 1 U NIT - EC380DL EXCAVATOR 2013 V IN # VCEC380DP00270821BREAKING HAMMER 20 13 |