| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| SCOTT ENGINEERING AND PROCUREMENT I | 5 shipments |
| HS Code | Shipments |
|---|---|
| 848350 Pulleys and flywheels, including pulley blocks | 2 shipments |
| 842511 Pulley tackle and hoists; powered by an electric motor (excluding skip hoists or hoists of a kind used for raising vehicles) | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-09-12 | SINOSHE22083696C | SCOTT ENGINEERING AND PROCUREMENT I | 15420.0 kg | 848350 | PULLEYS SPROCKET |
| 2021-11-17 | SXCOSHE21094370B | SCOTT ENGINEERING AND PROCUREMENT I | 12373.0 kg | 848350 | PULLEYS SPROCKET PULLEYS SPROCKET |
| 2021-09-29 | SXCOSHE21084479F | SCOTT ENGINEERING AND PROCUREMENT I | 2935.0 kg | SPROCKET QD BUSH | |
| 2021-08-06 | SXCOSHE21073396A | SCOTT ENGINEERING AND PROCUREMENT I | 4090.0 kg | 842511 | PULLEY SPROCKET |
| 2021-07-25 | SXCOSHE21063389J | SCOTT ENGINEERING AND PROCUREMENT I | 5379.0 kg | SPROCKET |