| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.18 |
| Active Months: 1 | Average TEU per Shipment: 2.12 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| BOYER | 2 shipments |
| ARBE | 1 shipments |
| LOGISTICS TRANSIT NOUMEA | 1 shipments |
| HS Code | Shipments |
|---|---|
| 731700 Iron or steel; nails, tacks, drawing pins, corrugated nails, staples (not those of heading no. 8305) and the like, with heads of other material or not, but excluding articles with heads of copper | 2 shipments |
| 391739 Plastics; tubes, pipes and hoses thereof, n.e.c. in item no. 3917.30 | 1 shipments |
| 722230.0 Stainless steel bars and rods, angles, shapes and sections | 1 shipments |
| Arrival Date | Bill Of Lading | Consignee | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-28 | CMDULHV3767391 | LOGISTICS TRANSIT NOUMEA | 28504.0 kg | 722230.0 | FREIGHT COLLECT STEEL BARS + GRATINGS + STEEL PLATES |
| 2021-01-19 | CMDULHV2415534 | ARBE | 11434.0 kg | 391739 | FREIGHT PREPAID METAL TUBES |
| 2021-01-19 | CMDULHV2406012 | BOYER | 31180.0 kg | 731700 | CONSTRUCTION MATERIALS FREIGHT PREPAID CONSTRUCTION MATERIALS |
| 2021-01-06 | CMDULHV2415285 | BOYER | 48336.0 kg | 731700 | OF CONSTRUCTION MATERIALS TARIFF : 721442/731819/ 39259080/732690.... FREIGHT PREPAID OF CONSTRUCTION MATERIALS TARIFF : 721420/731819/ 39259080/732690.... OF CONSTRUCTION MATERIALS TARIFF : 721442/731819/ 392590/73269092... |