ACE PNEUMATICS PVT LTD
ACE PNEUMATICS PVT LTD's Shipments Over Time
Supply Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.17 Average TEU per month: 0.25
Active Months: 1 Average TEU per Shipment: 1.50
Shipment Frequency Std. Dev.: 0.58
Shipments By Companies
Company Name Shipments
VULCAN DEMOLITION TOOLS INC 2 shipments
MICHAEL JOSIAH HEAVY DUTY EQUIPMENT CO LT 1 shipments
Shipments By HS Code
HS Code Shipments
846792.0 Tools; for working in the hand, pneumatic, hydraulic or with self-contained electric or non-electric motor 2 shipments
851190 Ignition or starting equipment; parts of the equipment of heading no. 8511, for use in spark-ignition or compression-ignition internal combustion engines 1 shipments
to show market analysis.
Similar Suppliers
to see more.
Latest Shipments
Arrival Date Bill Of Lading Consignee Weight HS Code Description
2026-04-15 EMUIMU25S0044553 VULCAN DEMOLITION TOOLS INC 3300.0 kg 846792.0 PARTS OF PNEUMATIC TOOLS PARTS OF THROTTLE LEVER PARTS OF PNEUMATIC TOOLS PARTS OF THROTTLE LEVER HSN CODE.
2026-04-09 GLSEUFM126020771 VULCAN DEMOLITION TOOLS INC 300.0 kg 846792.0 PARTS OF PNEUMATIC TOOLSHS CODE
2023-08-19 GLSEMUM23070466 MICHAEL JOSIAH HEAVY DUTY EQUIPMENT CO LT 630.0 kg 851190 ROCK BREAKER SPARES, CONICAL POINT CHISEL, WE.
Contact information Request
to request contact information.
Other address
G126 M I D C 111
FACTORY G 126 MIDC NIMBALAK MAHARA SHTRAAHMEDNAGAR 414111 INDIA