| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.46 | Average TEU per month: 0.62 |
| Active Months: 2 | Average TEU per Shipment: 1.25 |
| Shipment Frequency Std. Dev.: 1.13 |
| Company Name | Shipments |
|---|---|
| PRECISION ENGINEERS PLOT | 2 shipments |
| SNEH ENGINEERING WORKS PLOT | 2 shipments |
| BHARAT FIBERGLASS INDUSTRIES | 1 shipments |
| MJUNCTION SERVICES LIMITED | 1 shipments |
| HS Code | Shipments |
|---|---|
| 750720.0 Nickel; tubes, pipes and tube or pipe fittings (e.g. couplings, elbows, sleeves) | 1 shipments |
| 761520.0 Aluminium; table, kitchen or other household articles and parts thereof, pot scourers and scouring or polishing pads, gloves and the like, sanitary ware and parts thereof | 1 shipments |
| 761610.0 Aluminium; articles n.e.c. in chapter 76 | 1 shipments |
| 840690.0 Turbines; steam and other vapour turbines | 1 shipments |
| 854012.0 Thermionic, cold cathode or photo-cathode valves and tubes (e.g. vacuum, vapour, gas filled valves and tubes, mercury arc rectifying valves and tubes, cathode-ray and television camera tubes) | 1 shipments |
| 940530.0 Lamps, light fittings; including searchlights, spotlights and parts thereof, n.e.c.; illuminated signs, name-plates and the like, having permanently fixed light source and parts thereof n.e.c. or included | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2026-02-12 | SGVFMUM002565 | PRECISION ENGINEERS PLOT | 532.0 kg | 840690.0 | BSC, BTC, BC ASSEMBLY, CART HANDLE, FC BC, VB, W, VJ, FC ALUMINUM MACHINED PARTS FVO BRASS MACHINED PARTS, VJ BLACK PP MACHINEPARTS FOC |
| 2026-02-12 | SGVFMUM002566 | MJUNCTION SERVICES LIMITED | 56.0 kg | 940530.0 | DU--T, EP, BP, PH, PH, DFH DFH, DFST, MS PB TRAY, B SERIES, MAT SERIES, DF, DUO |
| 2026-02-12 | SGVFMUM002567 | SNEH ENGINEERING WORKS PLOT | 215.0 kg | 761610.0 | FG SS STUD (SS ROD WITH HOLES FOR COTTER PINS, FG CR (WITH MODIFIED / DIAMETER TO BE LIGHTER |
| 2025-12-02 | SGVFMUM002452 | BHARAT FIBERGLASS INDUSTRIES | 783.0 kg | 750720.0 | BJR - FIBERGLASS TUBE BJR TOOLING CT - FIBERGLASS TUBE CT TOOLING |
| 2025-12-02 | SGVFMUM002450 | PRECISION ENGINEERS PLOT | 736.0 kg | 761520.0 | ALUMINUM MACHINED PARTS ASSEMBLY ALUMINUM MACHINED PARTS CART HANDLE ALUMINUM MACHINED PARTS |
| 2025-12-02 | SGVFMUM002451 | SNEH ENGINEERING WORKS PLOT | 1410.0 kg | 854012.0 | ALUMINIUM DIAMOND PLATE ALUMINIUM DIAMOND PLATE -ASSEMBLY / LABOUR CHARGE LARGE, SMALL CHANNELS ANGLE PLATE -LEFT, RIGHT SHORT SQUARE TUBE REAR SQUARE TUBE FRONT LEFT, RIGHT SQUARE TUBE |