| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.17 | Average TEU per month: 4.33 |
| Active Months: 2 | Average TEU per Shipment: 26.00 |
| Shipment Frequency Std. Dev.: 0.39 |
| Company Name | Shipments |
|---|---|
| TSK ELECTRONICA Y ELECTRICIDAD SA | 1 shipments |
| TSK ELECTRONICA Y ELECTRICIDAD SA TSK ELECTRONICA Y ELECTRICIDAD S A | 1 shipments |
| HS Code | Shipments |
|---|---|
| 731700.0 Nails, tacks, drawing pins, corrugated nails, staples (not those of heading no. 8305) and the like, of iron or steel, with heads of other material or not, but excluding articles with heads of copper | 2 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-03 | MAEI255476814 | TSK ELECTRONICA Y ELECTRICIDAD SA TSK ELECTRONICA Y ELECTRICIDAD S A | 219594.56 kg | 731700.0 | STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST B FREIGHT PREPAID STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST B FREIGHT PREPAID STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST B FREIGHT PREPAID STEEL GALVANIZE |
| 2025-08-27 | MAEI255408083 | TSK ELECTRONICA Y ELECTRICIDAD SA | 330731.55 kg | 731700.0 | STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST FREIGHT PREPAID STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST FREIGHT PREPAID STEEL GALVANIZED POST MATERIAL SHIPPED UNDER PACKING LIST FREIGHT PREPAID STEEL GALVANIZED POST |