VALEO FRONT END MODULE THERMAL SYSTEMS
VALEO FRONT END MODULE THERMAL SYSTEMS's Shipments Over Time
Purchase Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 1.77 Average TEU per month: 2.67
Active Months: 10 Average TEU per Shipment: 1.39
Shipment Frequency Std. Dev.: 1.96
Shipments By Companies
Company Name Shipments
CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 25 shipments
SUNRISE MACHINERY CO LTD 5 shipments
VALEO SIAM THERMAL SYSTEMS CO LTD 5 shipments
Shipments By HS Code
HS Code Shipments
950320 Tricycles, scooters, pedal cars and similar wheeled toys; dolls' carriages; dolls; other toys; reduced-size (scale) models and similar recreational models, working or not; puzzles of all kinds 16 shipments
820520 Tools, hand; (including glaziers' diamonds) n.e.c.; blow lamps; vices, clamps etc, other than accessories for and parts of, machine-tools or water-jet cutting machines; anvils; portable forges; hand or pedal operated grinding wheels with frameworks : Tools, hand; hammers and sledge hammers 6 shipments
841590 Air conditioning machines; comprising a motor driven fan and elements for changing the temperature and humidity, including those machines in which the humidity cannot be separately regulated : Air conditioning machines; with motor driven fan and elements for temperature control, parts thereof 5 shipments
560500 Yarn; metallised, whether or not gimped, of textile yarn, or strip or the like of heading no. 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal : Yarn; metallised, whether or not gimped, of textile yarn, or strip or the like of heading no. 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal 3 shipments
560500.0 Yarn; metallised, whether or not gimped, of textile yarn, or strip or the like of heading no. 5404 or 5405, combined with metal in the form of thread, strip or powder or covered with metal 2 shipments
550922 Yarn (other than sewing thread) of synthetic staple fibres, not put up for retail sale : Yarn; (not sewing thread), multiple (folded) or cabled yarn, of synthetic staple fibres, containing 85% or more by weight of polyester, not put up for retail sale 1 shipments
790310 Zinc; dust, powders and flakes : Zinc dust 1 shipments
845710 Machining centres, unit construction machines (single station) and multi-station transfer machines for working metal : Machining centres; for working metal 1 shipments
to show market analysis.
Similar Companies
to see more.
Latest Shipments
Arrival Date Bill Of Lading Shipper Weight HS Code Description
2025-10-23 NECISSHA250334 SUNRISE MACHINERY CO LTD 2682.0 kg 560500.0 U SHAPE METAL STRIP LOWER FRAME METAL INSERT
2025-09-24 NECISSHA250299 SUNRISE MACHINERY CO LTD 2276.0 kg 560500.0 U SHAPE METAL STRIP
2025-07-24 NECISSHA250216 SUNRISE MACHINERY CO LTD 3268.0 kg 560500 LOWER FRAME METAL INSERT U SHAPE METAL STRIP
2025-07-03 NECISSHA250195B CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 3620.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH DUST COVER
2025-07-03 NECISSHA250192 SUNRISE MACHINERY CO LTD 3356.0 kg 560500 LOWER FRAME METAL INSERT U SHAPE METAL STRIP
2025-06-27 NECISSHA250182 SUNRISE MACHINERY CO LTD 2908.0 kg 560500 LOWER FRAME METAL INSERT U SHAPE METAL STRIP
2025-05-26 NECISSHA250151M CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2530.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH DUST COVER
2025-05-14 NECISSHA250129M CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2184.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH DUST COVER
2025-05-12 NECISSHA250134P CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 71.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM
2025-05-12 NECISSHA250134A CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1832.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM
2025-05-12 NECISSHA250134O CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1973.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH DUST COVER
2025-05-08 NECISSHA250100U CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 3590.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2025-05-08 NECISSHA250100A CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2222.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2025-04-10 NECISSHA250089J CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1053.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER DUST COVER
2025-04-07 NECISSHA250076F CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 404.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT RH DUST COVER
2025-03-17 NECISSHA250057O CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 517.0 kg 790310 ASSEMBLY OF SLEDGE AND U CLIP ARM DUST COVER
2025-02-16 NECISSHA250049B CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1797.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP
2025-02-16 NECISSHA250049Q1 CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 4029.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM
2025-02-08 NECISSHA250018B CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1660.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH DUST COVER
2025-02-08 NECISSHA250018P1 CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1778.0 kg 550922 ASSEMBLY OF SLEDGE AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2025-01-16 NECISSHA240608B1 CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1961.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2025-01-05 NECISSHA240600T CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1402.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2024-12-09 NECISSHA240576A CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2008.0 kg 950320 ASSEMBLY OF SLEDGE AND U CLIP ASSEMBLY OF SOCKET AND U CLIP ARM ASSEMBLY OF Y AND Z ADJUSTER Z-SUPPORT LH Z-SUPPORT RH
2024-10-08 NECISSHA240489D CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2666.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2024-10-08 NECISSHA240489G CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 2366.0 kg 845710 ASSEMBLY OF Y AND Z ADJUSTER
2024-09-06 NECISSHA240444C CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1100.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2024-09-06 NECISSHA240444D CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 1187.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2024-08-30 NECISSHA240427L CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 792.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2024-07-17 NECISSHA240347P CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 581.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2024-02-24 NECISSHA240100O CHANGCHUN TIANLONG AUTOMOTIVE COMPONENTS CO LTD 246.0 kg 820520 ASSEMBLY OF SLEDGE AND U CLIP
2023-04-28 TSVCTHBKK485838 VALEO SIAM THERMAL SYSTEMS CO LTD 9762.0 kg 841590 (144 PALLETS = 2,448 PIECES) CONDENSER ASSY INVOICE NO.83054050, 83054154 DATE: 28-FEB-23 HS CODE: 841590 (144 PALLETS = 2,448 PIECES) CONDENSER ASSY INVOICE NO.83054050, 83054154 DATE: 28-FEB-23 HS CODE: 841590
2023-04-22 TSVCTHBKK485550 VALEO SIAM THERMAL SYSTEMS CO LTD 14643.0 kg 841590 (216 PALLETS = 3,672 PIECES) CONDENSER ASSY INVOICE NO.83053200, 83053647 DATE: 8-FEB-23 INVOICE NO.83053648 DATE: 16-FEB-23 HS CODE: 841590 (216 PALLETS = 3,672 PIECES) CONDENSER ASSY INVOICE NO.83053200, 83053647 DATE: 8-FEB-23 INVOICE NO.83053648 DATE: 16-FEB-23 HS CODE: 841590 (216 PALLETS = 3,672 PIECES) CONDENSER ASSY INVOICE NO.83053200, 83053647 DATE: 8-FEB-23 INVOICE NO.83053648 DATE: 16-FEB-23 HS CODE: 841590
2023-04-15 TSVCTHBKK484861 VALEO SIAM THERMAL SYSTEMS CO LTD 4881.0 kg 841590 (72 PALLETS = 1,224 PIECES) CONDENSER ASSY INVOICE NO.83053199 DATE: 8-FEB-23 HS CODE: 841590
2023-03-17 TSVCTHBKK484817 VALEO SIAM THERMAL SYSTEMS CO LTD 29289.0 kg 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590 (432 PALLETS = 7,344 PIECES) CONDENSER ASSY INVOICE NO.83052847, 83052848, 83052849, 83052850, 83052959, 83052960 DATE: 12-JAN-23 HS CODE: 841590
2023-02-21 TSVCTHBKK484742 VALEO SIAM THERMAL SYSTEMS CO LTD 9763.0 kg 841590 (144 PALLETS = 2,448 PIECES) CONDENSER ASSY INVOICE NO. 83052151 DATE: 8-DEC-22 INVOICE NO. 83052780 DATE: 9-JAN-23 HS CODE: 841590 (144 PALLETS = 2,448 PIECES) CONDENSER ASSY INVOICE NO. 83052151 DATE: 8-DEC-22 INVOICE NO. 83052780 DATE: 9-JAN-23 HS CODE: 841590
Contact information
Search contact information on RocketReach
Other address
611 EAST ENON SPRINGS RD SMYRNA TENNESSEE 37167 USA
611 ENON SPRINGS ROAD EAST SMYRNA TN 37167 UNITED STATES US