| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.88 |
| Active Months: 1 | Average TEU per Shipment: 10.50 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| CALIK ENERJI SAN VE TIC A S | 1 shipments |
| HS Code | Shipments |
|---|---|
| 841989.0 Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-11-23 | MEDUXF642623 | CALIK ENERJI SAN VE TIC A S | 67395.0 kg | 841989.0 | MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - CRATE(S) LUBE OIL COOLERS PART SHIPM ENT SHIPPERS OWN CONTAINERS LUBE OIL COO LERS SUPPLY AND INSTALLATION OF THE MW P OWER PLANT BASED ON SIMPLE CYCLE GAS TURBINESFOR POWER GENERATION SHIPPER DECLARES FOR IT S OWN AND SOLE PURPOSES L/C NUMBER LINF AND DATE / / . FREIGHT PREPAID MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT MACHINERY, PLANT OR LABORATORY EQUIPMENT, WHETHER - LUBE OIL COOLERS PART SHIPMENT |