| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.25 | Average TEU per month: 0.46 |
| Active Months: 1 | Average TEU per Shipment: 1.83 |
| Shipment Frequency Std. Dev.: 0.87 |
| Company Name | Shipments |
|---|---|
| TIANJIN DONGCHUN TAIKI METAL FINISH CONVEYOR SYSTEM MANUFACTURING CO | 2 shipments |
| HUBER & RANNER GMBH | 1 shipments |
| HS Code | Shipments |
|---|---|
| 851590 Electric (electrically heated gas) soldering, brazing, welding machines and apparatus, capable or not of cutting, electric machines and apparatus for hot spraying of metals or sintered carbides : Welding, brazing or soldering machines; parts of the machines of heading no. 8515 | 1 shipments |
| 900120 Optical fibres and optical fibre bundles; optical fibre cables not of heading no. 8544; sheets, plates of polarising material; lenses, prisms, mirrors, of any material; unmounted; not non optical glass : Optical elements; polarising material, sheets and plates thereof | 1 shipments |
| 981800.0 | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-24 | CGLSCTJ25070067 | TIANJIN DONGCHUN TAIKI METAL FINISH CONVEYOR SYSTEM MANUFACTURING CO | 942.0 kg | 981800.0 | SPARE PARTS AS PER QUOTE # - - HS CODE: |
| 2025-08-09 | CGLSCTJ25060159 | TIANJIN DONGCHUN TAIKI METAL FINISH CONVEYOR SYSTEM MANUFACTURING CO | 4318.0 kg | 851590 | MANUFACTURING EQUIPMENT - ROLLER BED ASSEMBLY MANUFACTURING EQUIPMENT - ROLLER BED ASSEMBLY |
| 2025-08-05 | BANQ1068343675 | HUBER & RANNER GMBH | 2414.0 kg | 900120 | ASSEMBLY MATERIAL |
| 901 TOWER DRIVE SUITE 300 TROY MI 48098-281 US |
|---|