| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.33 | Average TEU per month: 2.17 |
| Active Months: 1 | Average TEU per Shipment: 6.50 |
| Shipment Frequency Std. Dev.: 1.15 |
| Company Name | Shipments |
|---|---|
| DANIELI AND C OFFICINE MECCANICHE S | 1 shipments |
| DANIELI ANDC OFFICINEMECCANICHES P | 1 shipments |
| SUZHOUHENGWOIMPORT ANDEXPORT CO | 1 shipments |
| YINGKOUBAYUQUANREFRACTORIESCO LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 631090 Rags; used or new, scrap twine, cordage, rope and cables and worn out articles of twine, cordage, rope or cables, of textile materials : Rags; used or new, scrap twine, cordage, rope and cables and worn out articles of twine, cordage, rope or cables, of textile materials; other than sorted | 1 shipments |
| 690210 Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods; other than those of siliceous fossil meals or similar siliceous earths : Refractory bricks, blocks, tiles and similar refractory ceramic constructional goods; containing by weight, singly or together, more than 50% of the elements Mg, Ca or Cr, expressed as MgO, CaO or Cr2o3 | 1 shipments |
| 842940 Bulldozers, graders, levellers, scrapers, angledozers, mechanical shovels, excavators, shovel loaders, tamping machines and road rollers, self-propelled : Tamping machines and road rollers; self-propelled | 1 shipments |
| 853010 Signalling, safety or traffic control equipment; for railways, tramways, roads, inland waterways, parking facilities, port installations, airfields, excluding those of heading no. 8608 : Signalling, safety or traffic control equipment; for railways or tramways (excluding those of heading no. 8608) | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-02-24 | SDVOSE24110321 | DANIELI ANDC OFFICINEMECCANICHES P | 113930.0 kg | 842940 | STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL STRAIGHTENING GRIDS, LINING UP ROLLERS PARTIAL SHIPMENT OUT OF : NEW 350.00 TPY SBQ MILL |
| 2025-02-24 | CDBQULX2411281S | YINGKOUBAYUQUANREFRACTORIESCO LTD | 28980.0 kg | 690210 | REFRACTORY BRICKS ORDER NO 24506679 SW-B&24506680 SW REFRACTORY BRICKS ORDER NO 24506679 SW-B&24506680 SW |
| 2025-02-24 | CDBQULX2411366S | SUZHOUHENGWOIMPORT ANDEXPORT CO | 35584.0 kg | 853010 | ELECTRIC SINGLEBEAMSUSPENSION CRANE NLX-3.2T-4.9M-4M(A5-M5) REMOTECONTROL (ABB) DOUBLEBEAMBRIDGECRANE QD20T/5T-13.7M-14M(A5-M5) WORKSHOP ANDSTANDPREPARATION AREAREMOTE CONTROL (ABB ELECTRIC SINGLEBEAMSUSPENSION CRANE NLX-3.2T-4.9M-4M(A5-M5) REMOTECONTROL (ABB) DOUBLEBEAMBRIDGECRANE QD20T/5T-13.7M-14M(A5-M5) WORKSHOP ANDSTANDPREPARATION AREAREMOTE CONTROL (ABB ELECTRIC SINGLEBEAMSUSPENSION CRANE NLX-3.2T-4.9M-4M(A5-M5) REMOTECONTROL (ABB) DOUBLEBEAMBRIDGECRANE QD20T/5T-13.7M-14M(A5-M5) WORKSHOP ANDSTANDPREPARATION AREAREMOTE CONTROL (ABB |
| 2025-02-24 | CDBQULX2411238S | DANIELI AND C OFFICINE MECCANICHE S | 49690.0 kg | 631090 | PARTIAL SHIPMENT OUT OF NEW 350.00 TPY SBQ MILL PARTIAL SHIPMENT OUT OF NEW 350.00 TPY SBQ MILL PARTIAL SHIPMENT OUT OF NEW 350.00 TPY SBQ MILL PARTIAL SHIPMENT OUT OF NEW 350.00 TPY SBQ MILL |