| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.12 |
| Active Months: 1 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| SHANGHAI FERROTEC POWER | 3 shipments |
| AURUBIS STOLBERG GMBH & CO | 1 shipments |
| AURUBIS STOLBERG ZWEIFALLER | 1 shipments |
| SHANGHAI FERROTEC POWER SEMICONDUCT ADD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 690510 Roofing tiles, chimney-pots, cowls, chimney liners, architectural ornaments and other ceramic constructional goods : Ceramic roofing tiles | 3 shipments |
| 740911 Copper plates, sheets and strip; of a thickness exceeding 0.15mm : Copper; strip, of a thickness exceeding 0.15mm, of refined copper, in coils | 2 shipments |
| 870323 Motor cars and other motor vehicles; principally designed for the transport of persons (other than those of heading no. 8702), including station wagons and racing cars : Vehicles; with only spark-ignition internal combustion reciprocating piston engine, cylinder capacity over 1500 but not over 3000cc | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-02-28 | SSLLBOS222061 | AURUBIS STOLBERG GMBH & CO | 3458.0 kg | 740911 | ON 6 PALLETS S.L.A.C. COPPER BAND AS PER INVOICE NO. 594088 594089 HS CODE 74091100 SCAC SSLL AMS BOS222061 |
| 2024-04-17 | SHPT16277538 | SHANGHAI FERROTEC POWER | 185.0 kg | 690510 | CERAMIC SUBSTRATE |
| 2024-02-06 | SHPT16256976 | SHANGHAI FERROTEC POWER | 246.0 kg | 690510 | CERAMIC SUBSTRATE |
| 2023-12-15 | SHPT16239050 | SHANGHAI FERROTEC POWER | 234.0 kg | 690510 | CERAMIC SUBSTRATE |
| 2023-09-21 | MCLMNBBOS2308003 | SHANGHAI FERROTEC POWER SEMICONDUCT ADD | 215.0 kg | 870323 | CERAMIC SUBSTRATE ALN-138190-0.38-0.30.3-S |
| 2023-06-21 | SSLLBOS220722 | AURUBIS STOLBERG ZWEIFALLER | 3815.0 kg | 740911 | COPPER BAND AS PER INVOICE NO. 572193 HS CODE 74091100 SCAC SSLL AMS-REF. BOS220722 |