| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| RENEW GROUP | 2 shipments |
| KNG DAITO S PTE LTD C/O RENEW GROUP | 1 shipments |
| HS Code | Shipments |
|---|---|
| 848420 Gaskets and similar joints of metal sheeting combined with other material or of two or more layers of metal; sets or assortments of gaskets and similar joints, dissimilar in composition, put up in pouches, envelopes or similar packings; mechanical seals : Seals; mechanical | 2 shipments |
| 910811 Watch movements; complete and assembled : Watch movements; complete and assembled, electrically operated, with mechanical display only or with a device to which a mechanical display can be incorporated | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-07-09 | ZIMUSIN8129623 | RENEW GROUP | 22054.94 kg | 848420 | 3 X 40HC CONTAINERS MECHANICAL SUB ASSEMBLY PROJECT : CEREZEN FREIGHT PREPAID 3 X 40HC CONTAINERS MECHANICAL SUB ASSEMBLY PROJECT : CEREZEN FREIGHT PREPAID 3 X 40HC CONTAINERS MECHANICAL SUB ASSEMBLY PROJECT : CEREZEN FREIGHT PREPAID |
| 2022-05-10 | ZIMUSIN8128355 | KNG DAITO S PTE LTD C/O RENEW GROUP | 13698.27 kg | 848420 | 2 X 40 HC CONTAINERS MECHANICAL SUB ASSEMBLY PROJECT: CEREZEN FREIGHT PREPAID 2 X 40 HC CONTAINERS MECHANICAL SUB ASSEMBLY PROJECT: CEREZEN FREIGHT PREPAID |
| 2022-04-28 | ZIMUSIN8128362 | RENEW GROUP | 6579.01 kg | 910811 | 1 X DV40 CONTAINER MECHANICAL SUB ASSEMBLY PROJECT: CEREZEN FREIGHT PREPAID |