| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.12 |
| Active Months: 1 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| EXPRESS ENGINEERING | 1 shipments |
| HIMILE MECHANICAL MANUFACTURING SH HIMILE INDUSTRIAL PARK KANGCHENG | 1 shipments |
| HS Code | Shipments |
|---|---|
| 850699 Cells and batteries; primary | 1 shipments |
| 920510 Musical instruments; wind (e.g. keyboard pipe organs, accordions, clarinets, trumpets, bagpipes), other than fairground organs and mechanical street organs : Musical instruments; brass-wind (e.g. trumpets), other than fairground organs and mechanical street organs | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-05-12 | DSVFEDC1186932 | EXPRESS ENGINEERING | 3190.0 kg | 850699 | OILWELL EQUIPMENT |
| 2023-04-01 | DFDSEDC0587646 | HIMILE MECHANICAL MANUFACTURING SH HIMILE INDUSTRIAL PARK KANGCHENG | 1800.0 kg | 920510 | HUB, KLV-14, ASSY, 10 IN KX SEAL, 10 KSI |
| PROJECT SHELL POWENAP III |
|---|