ROSEBURG WEST MDF LLC
ROSEBURG WEST MDF LLC's Shipments Over Time
Purchase Ratings
Shipment Reliability and Frequency Volume of Goods
Avg. Shipments per Month: 0.42 Average TEU per month: 3.58
Active Months: 2 Average TEU per Shipment: 8.60
Shipment Frequency Std. Dev.: 1.16
Shipments By Companies
Company Name Shipments
SIEMPELKAMP MASCHINEN UND ANLAGENBA 16 shipments
ANTHON GMBH 5 shipments
Shipments By HS Code
HS Code Shipments
841989 Machinery, plant (not domestic), or laboratory equipment; electrically heated or not, (excluding items in 85.14) for the treatment of materials by a process involving change of temperature; including instantaneous or non electric storage water heaters : Machinery, plant and laboratory equipment; for treating materials by change of temperature, other than for making hot drinks or cooking or heating food 15 shipments
851711.0 Telephone sets, including telephones for cellular networks or for other wireless networks; other apparatus for the transmission or reception of voice, images or other data (including wired/wireless networks), excluding items of 8443, 8525, 8527, or 8528 5 shipments
820770 Tools, interchangeable; for hand tools, whether or not power-operated, or for machine tools (pressing, stamping, punching, drilling etc), including dies for drawing or extruding metal, and rock drilling or earth boring tools : Tools, interchangeable; (for machine or hand tools, whether or not power-operated), for milling 1 shipments
to show market analysis.
Similar Companies
to see more.
Latest Shipments
Arrival Date Bill Of Lading Shipper Weight HS Code Description
2026-03-06 ACDF26100003800 ANTHON GMBH 62325.0 kg 851711.0 ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE ,
2026-02-24 ACDF26100003500 ANTHON GMBH 32366.0 kg 851711.0 ANTHON SANDING LINE , ANTHON SANDING LINE ,
2026-02-24 ACDF26100003600 ANTHON GMBH 55805.0 kg 851711.0 ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE ,
2026-02-24 ACDF26100003700 ANTHON GMBH 128555.0 kg 851711.0 ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE ,
2026-02-24 ACDF26100004500 ANTHON GMBH 13905.0 kg 851711.0 ANTHON SANDING LINE , ANTHON SANDING LINE , ANTHON SANDING LINE ,
2024-12-18 ACDF25100000101 SIEMPELKAMP MASCHINEN UND ANLAGENBA 345085.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . . . . .
2024-12-18 ACDF25100000103 SIEMPELKAMP MASCHINEN UND ANLAGENBA 87955.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . . . .
2024-12-18 ACDF25100000104 SIEMPELKAMP MASCHINEN UND ANLAGENBA 167275.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000108 SIEMPELKAMP MASCHINEN UND ANLAGENBA 125438.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000109 SIEMPELKAMP MASCHINEN UND ANLAGENBA 819355.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . . . . . . .
2024-12-18 ACDF25100000112 SIEMPELKAMP MASCHINEN UND ANLAGENBA 186860.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . . . .
2024-12-18 ACDF25100000113 SIEMPELKAMP MASCHINEN UND ANLAGENBA 251167.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000110 SIEMPELKAMP MASCHINEN UND ANLAGENBA 909608.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000102 SIEMPELKAMP MASCHINEN UND ANLAGENBA 49665.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000105 SIEMPELKAMP MASCHINEN UND ANLAGENBA 2850.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000106 SIEMPELKAMP MASCHINEN UND ANLAGENBA 125824.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . .
2024-12-18 ACDF25100000107 SIEMPELKAMP MASCHINEN UND ANLAGENBA 181935.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . . .
2024-12-18 ACDF25100000111 SIEMPELKAMP MASCHINEN UND ANLAGENBA 16367.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-18 ACDF25100000114 SIEMPELKAMP MASCHINEN UND ANLAGENBA 26245.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. . . .
2024-12-18 ACDF25100000115 SIEMPELKAMP MASCHINEN UND ANLAGENBA 25565.0 kg 841989 PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD. PART SHIPMENT 2 OUT OF: EQUIPMENT FOR THE PLANT FOR THE PRODUCTION OF MDF TO BE INSTALLED IN DILLARD.
2024-12-04 ACDF24100037700 SIEMPELKAMP MASCHINEN UND ANLAGENBA 2355.0 kg 820770 PART SHIPMENT 1 OUT OF:
Contact information
Search contact information on RocketReach
Other address
3660 GATEWAY STREET SPRINGFIELD OR 97477 US