| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| XI AN PROCOM ENGINEERING LTD | 7 shipments |
| XI AN CHENGHUA ENGINEERING CO LTD | 2 shipments |
| CHENGHUA ENGINEERING CO LTD | 1 shipments |
| PROCOM ENGINEERING INC | 1 shipments |
| PROCOM ENGINEERING LTD | 1 shipments |
| XIAN PROCOM ENGINEERING LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 401390 Inner tubes, of rubber : Rubber; inner tubes, n.e.c. in heading no. 4013 | 9 shipments |
| 090412 Pepper of the genus piper; dried or crushed or ground fruits of the genus capsicum or of the genus pimenta : Spices; pepper (of the genus piper), crushed or ground | 2 shipments |
| 820330 Tools, hand; files, rasps, pliers (including cutting pliers), pincers, tweezers, metal cutting shears, pipe cutters, bolt croppers, perforating punches and similar : Tools, hand; metal cutting shears and similar tools | 1 shipments |
| 847040 Calculating machines and pocket-size data recording, reproducing and displaying machines with calculating functions; accounting machines, postage-franking machines, ticket-issuing machines and similar, incorporating a calculating device; cash registers | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2024-06-27 | AMIGL240252764A | XI AN PROCOM ENGINEERING LTD | 7190.0 kg | 401390 | MOTORCYCLE PARTS |
| 2022-09-16 | GLCAGMT525434 | PROCOM ENGINEERING LTD | 9827.0 kg | 401390 | MOTORCYCLE PARTS |
| 2022-03-23 | DWCHSSHAS0083823 | XI AN CHENGHUA ENGINEERING CO LTD | 8000.0 kg | 090412 | SEA PIPER 35 |
| 2022-03-05 | OERT205S02L01040 | XI AN CHENGHUA ENGINEERING CO LTD | 8240.0 kg | 090412 | SEA PIPER 35 YACHT MOULD THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS CY/RAMP SEA PIPER 35 YACHT MOULD THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS CY/RAMP SEA PIPER 35 YACHT MOULD THIS SHIPMENT CONTAINS NO WOOD PACKING MATERIALS CY/RAMP |
| 2022-01-09 | CMDUCNCC356090 | CHENGHUA ENGINEERING CO LTD | 13130.0 kg | 847040 | SEA PIPER 35 YACHT EMAIL:ACCOUNTING PROCOMEN G.COM OVERSIZE - HEIGHT: 1.7 40FF SUBSTITUTE FOR 40FR |
| 2021-12-18 | GLCAGMT475754 | PROCOM ENGINEERING INC | 8349.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-10-19 | DMERDFS073001066 | XI AN PROCOM ENGINEERING LTD | 9285.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-10-03 | DMERDFS073001064 | XIAN PROCOM ENGINEERING LTD | 6960.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-07-12 | DMERDFS073001058 | XI AN PROCOM ENGINEERING LTD | 5803.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-07-11 | DMERDFS073001059 | XI AN PROCOM ENGINEERING LTD | 4361.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-02-27 | DMERDFS073001048 | XI AN PROCOM ENGINEERING LTD | 3120.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-01-19 | DMERDFS073001042 | XI AN PROCOM ENGINEERING LTD | 2753.0 kg | 401390 | MOTORCYCLE PARTS |
| 2021-01-14 | DMERDFS073001040 | XI AN PROCOM ENGINEERING LTD | 5844.0 kg | 820330 | MOTORCYCLE PARTS KOUL TOOLS |