| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.75 | Average TEU per month: 0.83 |
| Active Months: 5 | Average TEU per Shipment: 1.11 |
| Shipment Frequency Std. Dev.: 1.06 |
| Company Name | Shipments |
|---|---|
| JIANGSU ZHENYE MACHINERY CO LTD | 8 shipments |
| ZHEJIANG DONGXING AUTO PARTS CO LTD | 1 shipments |
| HS Code | Shipments |
|---|---|
| 842511 Pulley tackle and hoists other than skip hoists; winches and capstans; jacks : Pulley tackle and hoists; powered by an electric motor (excluding skip hoists or hoists of a kind used for raising vehicles) | 6 shipments |
| 842511.0 Pulley tackle and hoists other than skip hoists; winches and capstans; jacks | 3 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-10-30 | MWQTHRU09243 | JIANGSU ZHENYE MACHINERY CO LTD | 6220.0 kg | 842511.0 | PULLEY TAPERED |
| 2025-09-10 | MWQTHRU08297 | JIANGSU ZHENYE MACHINERY CO LTD | 6220.0 kg | 842511.0 | PULLEY TAPERED |
| 2025-08-25 | MWQTHRU07243 | JIANGSU ZHENYE MACHINERY CO LTD | 1618.0 kg | 842511.0 | PULLEY TAPERED |
| 2025-08-10 | MWQTHRU07190 | ZHEJIANG DONGXING AUTO PARTS CO LTD | 1960.0 kg | 842511 | SPUN PULLEY |
| 2025-07-17 | MWQTHRU06246 | JIANGSU ZHENYE MACHINERY CO LTD | 4780.0 kg | 842511 | PULLEY TAPERED |
| 2025-07-11 | MWQTHRU06209 | JIANGSU ZHENYE MACHINERY CO LTD | 1395.0 kg | 842511 | PULLEY TAPERED |
| 2025-07-08 | MWQTHRU06193 | JIANGSU ZHENYE MACHINERY CO LTD | 3237.0 kg | 842511 | PULLEY TAPERED |
| 2025-06-27 | MWQTHRU06134 | JIANGSU ZHENYE MACHINERY CO LTD | 1618.0 kg | 842511 | PULLEY TAPERED |
| 2025-06-19 | MWQTHRU05208 | JIANGSU ZHENYE MACHINERY CO LTD | 1395.0 kg | 842511 | PULLEY TAPERED |