| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| ECOSTEEL SA | 1 shipments |
| HS Code | Shipments |
|---|---|
| 840212 Boilers; steam or other vapour generating (other than central heating hot water boilers, capable also of producing low pressure steam), super heated water boilers : Boilers; watertube boilers with a steam production not exceeding 45t per hour | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2023-10-18 | MAEU231568662 | ECOSTEEL SA | 10004.6 kg | 840212 | 45 PACKAGES FULL PAVILLION PROJETC - NOT ASSEMBLED |