| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.08 | Average TEU per month: 0.08 |
| Active Months: 1 | Average TEU per Shipment: 1.00 |
| Shipment Frequency Std. Dev.: 0.29 |
| Company Name | Shipments |
|---|---|
| PIETRO CARNAGHI SPA | 7 shipments |
| HS Code | Shipments |
|---|---|
| 820780 Tools, interchangeable; for hand tools, whether or not power-operated, or for machine tools (pressing, stamping, punching, drilling etc), including dies for drawing or extruding metal, and rock drilling or earth boring tools : Tools, interchangeable; (for machine or hand tools, whether or not power-operated), for turning | 3 shipments |
| 845891 Lathes for removing metal : Lathes; for removing metal, numerically controlled, other than horizontal lathes | 2 shipments |
| 490191 Printed books, brochures, leaflets and similar printed matter, whether or not in single sheets : Printed matter; dictionaries, encyclopaedias and serial instalments thereof | 1 shipments |
| 845931 Machine-tools; (including way-type unit head machines) for drilling, boring, milling, threading or tapping by removing metal, other than lathes of heading no. 8458 : Machine-tools; for boring-milling by removing metal, numerically controlled | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-01-27 | MEDUGD980983 | PIETRO CARNAGHI SPA | 4350.0 kg | 845931 | 45# HEAVY DUTY MILLING HEAD VERTICAL OFFSET MILLING HEAD UNIVERSAL MILLING/BORING HEAD AUTOMATIC VERTICAL RIGHT AND HORIZONTAL LEFT TOOL HOLDER CAPTO C8 HEADS POSITION STORAGE RACKS |
| 2023-06-12 | SFFVHMPMBA305001 | PIETRO CARNAGHI SPA | 408570000.0 kg | 820780 | PARTIAL SHIPMENT OF NO.1 VERTICAL TURNING CEN. . . . |
| 2022-05-14 | MEDULV219331 | PIETRO CARNAGHI SPA | 46965.0 kg | 820780 | PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY FREIGHT PREPAID PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY |
| 2022-05-08 | ZIMUGOA1042272 | PIETRO CARNAGHI SPA | 26210.37 kg | 845891 | PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY HS CODE: 845891 PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL AP 80 TMY HS CODE: 845891 |
| 2022-05-08 | ZIMUGOA1042274 | PIETRO CARNAGHI SPA | 26790.07 kg | 845891 | NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 HS CODE: 845 891 NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 HS CODE: 845 891 NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 HS CODE: 845891 |
| 2022-04-26 | SFFVFTPMBA204001 | PIETRO CARNAGHI SPA | 410735.0 kg | 820780 | PROJECT PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 PROJECT TOOLS FOR ASSEMBLING ACTIVITIES MATERIAL OF OUR PROPERTY TO RETURN AFTER THE END OF ACTIVITIES . |
| 2022-04-20 | MEDUIG942531 | PIETRO CARNAGHI SPA | 36047.0 kg | 490191 | PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 FREIGHT PREPAID GOODS ON BOARD PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 PARTIAL SHIPMENT OF: NO. 1 VERTICAL TURNING CENTER MODEL 80TMY 8000 SERIAL NO. 211061 # JOB 48290 |