| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.14 | Average TEU per month: 0.21 |
| Active Months: 2 | Average TEU per Shipment: 1.25 |
| Shipment Frequency Std. Dev.: 0.36 |
| Company Name | Shipments |
|---|---|
| PARAS ENGINEERING WORKS COAL DAMP TNM | 3 shipments |
| PARAS ENGINEERING WORKS T N M | 1 shipments |
| HS Code | Shipments |
|---|---|
| 730890 Structures of iron or steel and parts thereof; plates, rods, angles, shapes, sections, tubes and the like, prepared for use in structures : Iron or steel; structures and parts thereof, n.e.c. in heading 7308 | 2 shipments |
| 441510 Packing cases, boxes, crates, drums and similar packings, of wood; cable-drums of wood; pallets, box pallets and other load boards, of wood; pallet collars of wood : Wood; cases, boxes, crates, drums, similar packings and cable-drums | 1 shipments |
| 830241.0 Base metal mountings, fittings and similar articles for furniture, doors, staircases, windows, trunks, chests etc, castors with mountings of base metal, automatic door closers of base metal | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-09-14 | LCQILIMKOL204148 | PARAS ENGINEERING WORKS COAL DAMP TNM | 17600.0 kg | 830241.0 | GALVANIZED FABRICATED STEEL HARDWARE STRUCTURE |
| 2025-06-05 | BANQ1065706414 | PARAS ENGINEERING WORKS T N M | 17415.0 kg | 441510 | 01X20 CONTAINER STC GALVANIZED FABRICATED STEEL HARDWARE STRUCTURE INVOICE NO. PEW 106 24-25 DT-27.03.2025 BUYERS ORDER NO. P.O-P003 DT 20.01.2025 PACKING PACKING : TOTAL 21 CRATES S B NO: 9400704 DT 27.03.2025 NET WT:17007.20 KGS |
| 2024-10-23 | LCQILIMKOL203762 | PARAS ENGINEERING WORKS COAL DAMP TNM | 17680.0 kg | 730890 | SAID TO CONTAIN01 X 20 FCL CONTAINER STC GAL VANIZEDFABRICATED STEEL HARDWARE STRUCTUREINVOICE NO. PEW/030/24-25 DT-24.07.2024BUYER S ORDER NO.P.O-P002 DT 19.04.2024PACKING: TOTAL 18 CRATESSB NO. 2656596 DT. 24.07.2024NET WT:16881.650 KGSHS CODE: 73089090SHIPPED ON BOA RD: 04.08.2024 |
| 2023-06-15 | DMALCCUA10022 | PARAS ENGINEERING WORKS COAL DAMP TNM | 16210.0 kg | 730890 | GALVANIZED FABRICATED STEEL HARDWARE STRUCTURE INVOICE NO. PEW/007/23-24; DT-28.04.2023 BUYER S ORDER NO. P.O: P001; DT: 01.01.2023 PACKING: TOTAL 17 CRATES S/B NO: 9611972; D T: 28.04.2023 NET WT: 15726.000 KGS HS COD E: 73089090 |