| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.00 | Average TEU per month: 0.00 |
| Active Months: 0 | Average TEU per Shipment: N/A |
| Shipment Frequency Std. Dev.: 0.00 |
| Company Name | Shipments |
|---|---|
| SHANGHAI XIETONG GROUP CO LTD | 3 shipments |
| SHANGHAI XIETONG YONGHE INTERNATION NO | 1 shipments |
| HS Code | Shipments |
|---|---|
| 851490 Industrial or laboratory electric furnaces and ovens (including those functioning by induction or dielectric loss); other industrial or laboratory equipment for the heat treatment of materials by induction or dielectric loss : Furnaces, ovens and heating equipment; parts of the industrial or laboratory equipment of heading no. 8514 | 4 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2022-12-27 | HNLTSH22Q00711 | SHANGHAI XIETONG YONGHE INTERNATION NO | 61449.0 kg | 851490 | BLOWOUT PREVENTION PARTS BLOWOUT PREVENTION PARTS BLOWOUT PREVENTION PARTS |
| 2022-07-11 | HNLTSH22Q00191 | SHANGHAI XIETONG GROUP CO LTD | 41370.0 kg | 851490 | BLOWOUT PREVENTION PARTS BLOWOUT PREVENTION PARTS |
| 2022-04-15 | HNLTSH21Q01071 | SHANGHAI XIETONG GROUP CO LTD | 21468.0 kg | 851490 | BLOWOUT PREVENTION PARTS |
| 2022-01-25 | HNLTSH21Q01049 | SHANGHAI XIETONG GROUP CO LTD | 21431.0 kg | 851490 | BLOWOUT PREVENTION PARTS |