| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.12 | Average TEU per month: 0.33 |
| Active Months: 2 | Average TEU per Shipment: 2.00 |
| Shipment Frequency Std. Dev.: 0.33 |
| Company Name | Shipments |
|---|---|
| CHINA VIGOR DRILLING OIL TOOLS AND | 2 shipments |
| HS Code | Shipments |
|---|---|
| 730620.0 Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 | 1 shipments |
| 843149 Machinery parts; used solely or principally with the machinery of heading no. 8425 to 8430 : Machinery; parts of machines handling earth, minerals or ores and n.e.c. in heading no. 8431 | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-12-29 | CGLSCSH25111083 | CHINA VIGOR DRILLING OIL TOOLS AND | 10371.0 kg | 730620.0 | ACCESSOROES OF TUBING ANCHOR CASING SCRAPER CROSSOVER TUBING COUPLING |
| 2025-06-18 | CGLSCSH25050770 | CHINA VIGOR DRILLING OIL TOOLS AND | 35947.0 kg | 843149 | BRIDGE PLUG COMPONENTS COMPLETING TOOL PACKERMANDREL DRIFT CASING SCRAPER END SHIPPING CA P BRIDGE PLUG COMPONENTS COMPLETING TOOL PACKERMANDREL DRIFT CASING SCRAPER END SHIPPING CA P |