| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.75 | Average TEU per month: 1.12 |
| Active Months: 3 | Average TEU per Shipment: 1.50 |
| Shipment Frequency Std. Dev.: 1.54 |
| Company Name | Shipments |
|---|---|
| GUANGDONG BOHONG TECHNOLOGY CO LTD | 6 shipments |
| GUANGDONG BOHONG TECHNOLOGY CO LT | 3 shipments |
| SHENZHEN JUNWANMA INC | 3 shipments |
| YUE YANG SHI JI LIMITED | 3 shipments |
| KUAI LIANG E COMMERCE LIMITED | 1 shipments |
| SHENZHEN DEJIAHONG INC | 1 shipments |
| HS Code | Shipments |
|---|---|
| 441700 Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood : Wood; tools, tool bodies, tool handles, broom or brush bodies and handles, boot and shoe lasts and trees, of wood | 7 shipments |
| 842119 Centrifuges, including centrifugal dryers; filtering or purifying machinery and apparatus for liquids or gases : Centrifuges; n.e.c. in heading no. 8421, including centrifugal dryers (but not clothes-dryers) | 6 shipments |
| 901910 Mechano-therapy, massage appliances; psychological aptitude testing apparatus; ozone, oxygen, aerosol therapy, artificial respiration or other therapeutic respiration apparatus : Mechano-therapy appliances; massage apparatus and psychological aptitude-testing apparatus | 2 shipments |
| 730630 Iron or steel (excluding cast iron); tubes, pipes and hollow profiles (not seamless), n.e.c. in chapter 73 : Iron or non-alloy steel (excluding cast iron); tubes and pipes (not seamless), welded, of circular cross-section, n.e.c. in chapter 73 | 1 shipments |
| 851629 Electric water, space, soil heaters; electro-thermic hair-dressing apparatus; hand dryers, irons; electro-thermic appliances for domestic purposes; electro heating resistors, not of heading no. 8545 : Heating apparatus; electric soil heating apparatus and space heating apparatus (excluding storage heating radiators) | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-01-21 | HNLTNB24JA1697 | SHENZHEN JUNWANMA INC | 3275.0 kg | 441700 | SPIN MOP THIS SHIPMENT CONTAINS NO WOOD PACKAGING MATERIALS |
| 2025-01-03 | CGLSB241210108B | SHENZHEN JUNWANMA INC | 3274.0 kg | 842119 | SPIN MOP |
| 2024-12-27 | CGLSB241203105 | GUANGDONG BOHONG TECHNOLOGY CO LT | 6470.0 kg | 842119 | SPIN MOP |
| 2024-12-27 | SZJDFCLN24120205 | GUANGDONG BOHONG TECHNOLOGY CO LT | 844.0 kg | 901910 | RN01 NECK AND SHOULDER MASSAGER |
| 2024-12-18 | EGLV143462610510 | GUANGDONG BOHONG TECHNOLOGY CO LTD | 6541.0 kg | 441700 | MOP MOP |
| 2024-12-07 | EGLV143473163332 | GUANGDONG BOHONG TECHNOLOGY CO LTD | 6435.0 kg | 842119 | SPIN MOP SPIN MOP THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS @ SHENZHEN, GUANGDONG |
| 2024-12-07 | EGLV143462603092 | GUANGDONG BOHONG TECHNOLOGY CO LTD | 6666.0 kg | 441700 | MOP MOP @STREET, LONGGANG DISTRICT, SHENZHEN |
| 2024-11-17 | SZJDFCLN24110258 | GUANGDONG BOHONG TECHNOLOGY CO LT | 6435.0 kg | 842119 | SPIN MOP |
| 2024-11-02 | SDVOSE24090935A | GUANGDONG BOHONG TECHNOLOGY CO LTD | 3265.0 kg | 842119 | SPIN MOP |
| 2024-10-12 | NIPANBMS2409578 | GUANGDONG BOHONG TECHNOLOGY CO LTD | 6529.0 kg | 842119 | SPIN MOP |
| 2024-09-29 | HYSLFHKG09240087 | SHENZHEN DEJIAHONG INC | 5308.0 kg | 851629 | HEATER HS CODE:8516290030 |
| 2024-09-26 | SMLYXS24080358 | GUANGDONG BOHONG TECHNOLOGY CO LTD | 6435.0 kg | 441700 | MOP 9603908050 |
| 2024-09-17 | CGLSB240901104A | SHENZHEN JUNWANMA INC | 2293.0 kg | 441700 | MOP |
| 2024-09-15 | TXSLES24081324A | KUAI LIANG E COMMERCE LIMITED | 528.0 kg | 730630 | HEATER |
| 2024-05-31 | PVIDNB40502749 | YUE YANG SHI JI LIMITED | 6568.0 kg | 441700 | MOP |
| 2024-04-16 | CHKMSLA403129015 | YUE YANG SHI JI LIMITED | 1537.0 kg | 901910 | SHOULDER MASSAGER |
| 2024-04-09 | PGCVMZ6628794 | YUE YANG SHI JI LIMITED | 6526.0 kg | 441700 | MOP |