| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.33 | Average TEU per month: 0.09 |
| Active Months: 1 | Average TEU per Shipment: 0.26 |
| Shipment Frequency Std. Dev.: 1.15 |
| Company Name | Shipments |
|---|---|
| HANGZHOU WELL TRANS SUPPLY CHAIN MA | 2 shipments |
| YIWU DT SUPPLY CHAIN MANA NORTH SIDE OF CHUANGXIN | 2 shipments |
| HS Code | Shipments |
|---|---|
| 460210 Basketwork, wickerwork and other articles, made directly to shape from plaiting materials or made up from goods of heading no. 4601; articles of loofah | 1 shipments |
| 721590 Iron or non-alloy steel; bars and rods, n.e.c. in chapter 72 : Iron or non-alloy steel; bars and rods, n.e.c. in chapter 72, n.e.c. in heading no. 7215 | 1 shipments |
| 760421 Aluminium; bars, rods and profiles : Aluminium; alloys, hollow profiles | 1 shipments |
| 900120 Optical fibres and optical fibre bundles; optical fibre cables not of heading no. 8544; sheets, plates of polarising material; lenses, prisms, mirrors, of any material; unmounted; not non optical glass : Optical elements; polarising material, sheets and plates thereof | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2024-11-26 | DWCH24HWS1344441 | HANGZHOU WELL TRANS SUPPLY CHAIN MA | 1.0 kg | 900120 | BRACELET MATERIAL: 925 SILVER,CASUAL SNEAKERSFOR MEN MATERIAL: PU,CELL PHONE CHARGING CAB LE MATERIAL: PVC,DRILL MATERIAL: IRON,KEYCHAIN MATERIAL: ALLOY,STORAGE CONTAINER MATERIAL:PAPER |
| 2024-11-20 | GWTH66YW02464652 | YIWU DT SUPPLY CHAIN MANA NORTH SIDE OF CHUANGXIN | 5.0 kg | 721590 | METAL PIPE DREDGING RODS, FABRIC MALE MENSHOE |
| 2024-11-14 | DWCH24HWS1097567 | HANGZHOU WELL TRANS SUPPLY CHAIN MA | 3.0 kg | 760421 | WHEELBARROW ALUMINUM ALLOY |
| 2024-11-06 | GWTHNB2409020921 | YIWU DT SUPPLY CHAIN MANA NORTH SIDE OF CHUANGXIN | 1.0 kg | 460210 | BAMBOO LAUNDRY BASKET |