| Shipment Reliability and Frequency | Volume of Goods |
|---|---|
| Avg. Shipments per Month: 0.17 | Average TEU per month: 0.25 |
| Active Months: 2 | Average TEU per Shipment: 1.00 |
| Shipment Frequency Std. Dev.: 0.51 |
| Company Name | Shipments |
|---|---|
| ZHEJIANG PENGYUAN NEW MATERIAL | 2 shipments |
| FOSHAN NANHAI KEERSI PLASTIC METALS FACTORY | 1 shipments |
| HS Code | Shipments |
|---|---|
| 450410 Agglomerated cork (with or without a binding substance) and articles of agglomerated cork : Cork; blocks, plates, sheets and strip, tiles of any shape, solid cylinders (including discs), of agglomerated cork (with or without a binding substance) | 1 shipments |
| 630790 Textiles; made up articles n.e.c. in chapter 63, including dress patterns : Textiles; made up articles (including dress patterns), n.e.c. in chapter 63, n.e.c. in heading no. 6307 | 1 shipments |
| 854790 Insulating fittings; for electrical machines, appliances, equipment, excluding insulators of heading no. 8546, electrical conduit tubing and joints therefore : Insulating fittings; (other than of ceramics or plastics), for electrical machines, appliances and equipment, excluding insulators of heading no. 8546 | 1 shipments |
| Arrival Date | Bill Of Lading | Shipper | Weight | HS Code | Description |
|---|---|---|---|---|---|
| 2025-08-19 | HILYSXDE25070187 | ZHEJIANG PENGYUAN NEW MATERIAL | 3000.0 kg | 854790 | BUBBLE INSULATION |
| 2025-08-17 | HILYSXDE25070158 | FOSHAN NANHAI KEERSI PLASTIC METALS FACTORY | 4560.0 kg | 630790 | SPA COVER HS CODE6307909000 SPA STEP HS CODE 3926909090 COVER LIFTER HS CODE7616999000 M ASSAGE BATHTUB HS CODE901910 |
| 2025-01-27 | HILYSXDE24120085 | ZHEJIANG PENGYUAN NEW MATERIAL | 2820.0 kg | 450410 | BUBBLE INSULATION THIS SHIPMENT CONTAINS NO SOLID WOOD PACKING MATERIALS |
| 3100 BOWLING GREEN RD FRANKLIN KY |
|---|